12.07.2015 Views

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong> <strong>Official</strong> <strong>Plan</strong>LEFROY SECONDARY PLAN<strong>Town</strong> shall consult with GO Rail on the specific location, type and design<strong>of</strong> any such crossing.13.7 MUNICIPAL SERVICES13.7.1 Generala) The trunk servicing plan for the Lefroy Secondary <strong>Plan</strong> area is shown onSchedule D5 – Municipal Servicing and Phasing <strong>Plan</strong>.b) The Lefroy Secondary <strong>Plan</strong> area shall generally be developed on the basis <strong>of</strong> fullmunicipal services including roads with curbs, sidewalks, piped water, sanitarysewers, storm drainage facilities, street lights and underground electricaldistribution systems.c) In extending services to develop greenfield parcels in the Lefroy Secondary <strong>Plan</strong>area, where an agreement has been reached with the municipality, developer(s)shall provide adjacent existing unserviced or partially serviced residences withthe opportunity to connect to the municipal servicing system.d) The cost <strong>of</strong> providing full municipal services to facilitate the development <strong>of</strong> landwithin the Lefroy Secondary <strong>Plan</strong> area shall be borne by current and futurebenefiting parties. This shall be achieved through the site plan or subdivisionapproval process where appropriate provision will be made for usingdevelopment charges, front ending agreements and cost-sharing.e) The design <strong>of</strong> municipal services shall incorporate measures that minimizeimpacts on the groundwater system and impacts on natural features.f) One Master Servicing Study shall be prepared in support <strong>of</strong> this Secondary <strong>Plan</strong>and approved by the <strong>Town</strong> in consultation with LSRCA. It shall identify thedesign requirements and phasing <strong>of</strong> stormwater management facilities, and trunkinfrastructure including pumping stations and reservoirs required to service theentire Lefroy Secondary <strong>Plan</strong> area. It shall also provide preliminary costing fortrunk infrastructure including pumping stations and reservoirs. As well, theMaster Servicing Study shall contain, as appendices, the Master Drainage <strong>Plan</strong>and Hydrogeology Study completed for the whole <strong>of</strong> the Secondary <strong>Plan</strong> area.Subsequent Functional Servicing Studies shall be prepared, as perSection 13.5.3, to identify detailed design requirements, and refinements <strong>of</strong>servicing costs prior to plan <strong>of</strong> subdivision approval.13.7.2 Sanitary Servicinga) The Lefroy Secondary <strong>Plan</strong> area shall be serviced by the extension <strong>of</strong> theexisting sanitary sewers shown on Schedule D5 - Municipal Servicing andPhasing <strong>Plan</strong>, Subject to Section 13.9.1.e). Proposed connection points to thisexisting system are indicated in general terms on the schedule.221Adopted July 26, 2006 <strong>Approved</strong> by <strong>OMB</strong> May 2009, March 2010 & April 8, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!