12.07.2015 Views

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong> <strong>Official</strong> <strong>Plan</strong>LEFROY SECONDARY PLANviii) preparation <strong>of</strong> a Stormwater Management <strong>Plan</strong>;ix) identification and refinement <strong>of</strong> infiltration areas as well as mechanisms andmeasures, where conditions permit, to prevent the loss <strong>of</strong> infiltration in theSecondary <strong>Plan</strong> area;x) demonstrate general conformity with the recommendations <strong>of</strong> the MasterServicing Study and identify where deviations are warranted, if any,xi) methods and measures to maintain the hydrologic function to natural heritagefeatures;xii) incorporation <strong>of</strong> mitigation measures recommended in the EIS andHydrogeological Study related to servicing, stormwater management,groundwater infiltration and discharge, and grading.b) To assist in the review <strong>of</strong> the Functional Servicing Study, the <strong>Town</strong> may retain apeer review consultant at the expense <strong>of</strong> the proponent.c) As part <strong>of</strong> the Functional Servicing Study, a Storm Water Management <strong>Plan</strong> shallbe prepared which: demonstrates general conformity with the recommendations<strong>of</strong> the Master Servicing Study; identifies where deviations are warranted, if any;provides supporting technical analyses for sizing and design <strong>of</strong> proposed stormwater management facilities and addresses relevant ecological, hydrological andhydrogeological issues arising out <strong>of</strong> other supporting studies.13.5.4 Hydrogeological Studya) A Hydrogeological Study shall be prepared, to the satisfaction <strong>of</strong> the <strong>Town</strong> inconsultation with the LSRCA, for each neighbourhood, in accordance with theapproved Master Servicing Study as per Section 13.7.1 f). It shall be based onterms <strong>of</strong> reference approved by the <strong>Town</strong> in consultation with the LSRCA, whichaddresses but is not limited to the following matters:i) a detailed water balance,ii) identification and refinement <strong>of</strong> infiltration areas shown in the HydrogeologyStudy component <strong>of</strong> the Master Servicing Study,iii) identification <strong>of</strong> lands contributing to infiltration areas,iv) dewatering requirements,v) impact on the water table <strong>of</strong> wetland areas and other natural heritagefeatures, as well as base flow to watercourses and means to mitigate impact,andvi) recommendations for a monitoring programme to address monitoring duringand after construction.b) To assist in the review <strong>of</strong> the Hydrogeological Study, the <strong>Town</strong> may retain a peerreview consultant at the expense <strong>of</strong> the proponent.c) A well survey shall be conducted within and adjacent to the Secondary <strong>Plan</strong> areaprior to draft plan approval. A subsequent well monitoring programme shall beestablished as a condition <strong>of</strong> draft plan approval.214Adopted July 26, 2006 <strong>Approved</strong> by <strong>OMB</strong> May 2009, March 2010 & April 8, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!