12.07.2015 Views

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong> <strong>Official</strong> <strong>Plan</strong>ALCONA URBAN SETTLEMENTb) Until the central water distribution system is constructed, development mayproceed on the basis <strong>of</strong> communal water systems, to be designed in a mannerwhich will permit connection to the overall water system, once constructed. Theapproval <strong>of</strong> all relevant agencies will be required, for each communal watersystem.c) The Alcona Secondary <strong>Plan</strong> Area shall be serviced by a loop water system whichwill be provided through the upgrading <strong>of</strong> the proposed water distribution works, orthrough the construction <strong>of</strong> the new works as follows:• An extension <strong>of</strong> the proposed feeder main on Seventh Line from theintersection <strong>of</strong> St. Johns Avenue westward to the Secondary <strong>Plan</strong> Areaboundary.• An upgrade <strong>of</strong> the feedermain on <strong>Innisfil</strong> Beach Road from the water treatmentplant to the reservoir, which is located west <strong>of</strong> the Secondary <strong>Plan</strong> Area.• The construction <strong>of</strong> a connecting main to be located on the major arterialbetween Seventh Line and <strong>Innisfil</strong> Beach Road.d) A Master Servicing <strong>Plan</strong> shall be prepared to identify detailed design requirements,phasing and cost <strong>of</strong> providing a water distribution system in the Alcona Secondary<strong>Plan</strong> Area prior to plan <strong>of</strong> subdivision approval.10.2.10.4 Storm Drainagea) Detention ponds shall be used as part <strong>of</strong> the stormwater management system forthe Alcona Secondary <strong>Plan</strong> Area.b) The stormwater management system for the Alcona Secondary <strong>Plan</strong> Area shallcontrol peak run<strong>of</strong>f rates to a level not greater than pre-development rates. Inaddition, the proposed stormwater management system is to address water qualityconcerns.c) Storm sewers in the Alcona Secondary <strong>Plan</strong> Area shall be designed in accordancewith the <strong>Town</strong> design standards.d) The stormwater management system for the Alcona Secondary <strong>Plan</strong> shall beimplemented through subdivision development in accordance with therecommendations <strong>of</strong> the Alcona Secondary <strong>Plan</strong> Master Servicing and Drainage<strong>Plan</strong> as approved by Council.10.2.10.5 Electrical Supplya) Wiring for electrical power distribution shall be located underground. Mainelectrical feeder transmission lines may be installed above ground along thecollector roads.b) A Master Servicing <strong>Plan</strong> shall be prepared to identify detailed design requirements,phasing and cost <strong>of</strong> providing an electrical distribution system in the AlconaSecondary <strong>Plan</strong> Area.167Adopted July 26, 2006 <strong>Approved</strong> by <strong>OMB</strong> May 2009, March 2010 & April 8, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!