12.07.2015 Views

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong> <strong>Official</strong> <strong>Plan</strong>IMPLEMENTATION9.17.2 The criteria for designation <strong>of</strong> Community Improvement Areas are as follows:i) a significant portion <strong>of</strong> houses/buildings require maintenance and rehabilitation;ii) municipal services (i.e. sanitary, storm water, sidewalks, curbs, lighting, parking,etc.) are in need <strong>of</strong> repair;iii) deficiency in open space areas or recreation facilities;iv) conflicting land uses;v) deterioration in streetscape, building facades and parking facilities in commercialareas; andvi) septic systems and wells being deficient.9.18 SECONDARY PLANS9.18.1 It is recommended that all new Secondary <strong>Plan</strong>s consider a consistent set <strong>of</strong> mattersand studies. These shall include:i) Hydrogeological studies to address groundwater recharge and dischargematters;ii) An environmental analysis to identify the significance, boundaries and potentialbuffers <strong>of</strong> the natural features that form the Natural Heritage System as perpolicy 2.4.1 and the Natural Environmental Area Designation, as per policy3.1.1.6, and where applicable, refine the boundaries. Terms <strong>of</strong> reference for suchstudy shall be developed by the <strong>Town</strong> in consultation with the County andapplicable Conservation Authority;iii) An analysis to determine how the Natural Heritage System can be implementedthrough the study area;iv) A master drainage plan to identify required stormwater works including howstormwater can traverse through any existing built up areas and how waterquantity and quality controls can be addressed. Such study shall conform to anyapplicable, approved watershed or sub-watershed plan;v) A servicing master plan to identify required water and sanitary works includingservicing options and means to service existing development;vi) A transportation and transit master plan which identifies necessary arterial andcollector road improvements and a future transit network;vii) A commercial needs analysis to identify the amount and type <strong>of</strong> commercialspace required in the Secondary <strong>Plan</strong> area and analysis <strong>of</strong> how existingcommercial designations, particularly Core Commercial Areas, will be protectedand enhanced;viii) An urban design report to identify urban design policies for the secondary planand urban design guidelines to guide future development;ix)A fiscal impact report that demonstrates that the proposed use will have a netpositive impact on the <strong>Town</strong>.130Adopted July 26, 2006 <strong>Approved</strong> by <strong>OMB</strong> May 2009, March 2010 & April 8, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!