12.07.2015 Views

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong> <strong>Official</strong> <strong>Plan</strong>TRANSPORTATION AND TRANSIT8.1.7.3 The <strong>Town</strong> shall undertake a capital budgeting and road improvement schedulingprogram.8.1.7.4 Future potential interchanges on Highway 400 as shown on Schedule C areanticipated by the <strong>Town</strong> to be required during the planning period. The <strong>Town</strong> shallwork with the County to encourage the early completion <strong>of</strong> these interchanges by theProvince.8.1.7.5 New lots shall not be created on private roads. New lots shall abut an open andmaintained public road.8.2 RAIL LINES8.2.1 The <strong>Town</strong> shall encourage the retention <strong>of</strong> rail lines throughout the <strong>Town</strong>.8.2.2 Railway crossings shall be improved where traffic volumes, sight lines or other factorsindicate the need for such improvement.8.2.3 Development, particularly residential development adjacent to rail lines shall be setback from the rail lines and suitable screening shall be provided. The implementingzoning by-law shall include appropriate provisions.8.2.4 No access points will be permitted onto a road in the immediate vicinity <strong>of</strong> a railcrossing.8.2.5 All proposed development within 300 metres <strong>of</strong> a railway right-<strong>of</strong>-way may be requiredto undertake noise studies, to the satisfaction <strong>of</strong> the <strong>Town</strong> in consultation with theappropriate railway, and shall undertake appropriate measures to mitigate any adverseeffects from identified noise levels.8.2.6 All proposed development within 75 metres <strong>of</strong> a railway right-<strong>of</strong>-way may be requiredto undertake vibration studies, to the satisfaction <strong>of</strong> the <strong>Town</strong> in consultation with theappropriate railway, and shall undertake appropriate measures to mitigate any adverseeffects from vibration that were identified.8.2.7 All proposed development adjacent to railways shall ensure that appropriate safetymeasures such as setbacks, berms and security fencing are provided, to thesatisfaction <strong>of</strong> the <strong>Town</strong> in consultation with the appropriate railway.8.3 TRANSIT8.3.1 The preferred GO Rail Station location is delineated on Schedule C at the Belle AireBeach Road. It was selected by GO Rail in their Environmental Assessment study. Ifthe lands are not required for a GO Station facility as determined by the <strong>Town</strong> subjectto an approved new or amended Environmental Assessment, an alternative location118Adopted July 26, 2006 <strong>Approved</strong> by <strong>OMB</strong> May 2009, March 2010 & April 8, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!