12.07.2015 Views

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong> <strong>Official</strong> <strong>Plan</strong>INFRASTRUCTUREany other development application. Water or wastewater treatment plant capacity willbe allocated for new development on a priority basis at the time <strong>of</strong> payment <strong>of</strong>Development Charges.7.1.11 A buffer zone around all municipal treatment facilities and pumping stations may needto be established to minimize any impact from nuisance effects. The <strong>Town</strong> may requirenoise and odour studies to be undertaken when development is proposed in the vicinity<strong>of</strong> any treatment facility and pumping station to determine if any buffering or mitigationmeasures are required.7.1.12 Within the Village Settlements, development may proceed, in some cases, on septictank systems, partial services and/or communal systems subject to the approval <strong>of</strong> the<strong>Town</strong>, in accordance with the analysis <strong>of</strong> a preferred servicing alternative as required bySections 2.6.5, 2.6.6 and 3.3.2.6.7.1.13 Despite the policies <strong>of</strong> this <strong>Plan</strong> to consider servicing alternatives in the VillageSettlements, it is the <strong>Town</strong>'s policy not to assume ownership <strong>of</strong> communal servicingsystems involving sewage disposal.7.2 DRAINAGE AND STORMWATER7.2.1 The flood standard shall generally be the Regional Design Storm. Some shorelineareas have flood line mapping to the 1 in 100 year storm event. The <strong>Town</strong> shallcontrol stormwater run<strong>of</strong>f from new development sites in order to attenuate topredevelopment levels for the 1 in 2 through 1 in 100 year storm event, and shallregulate land uses within the limit <strong>of</strong> the Regional Storm as set out in Section 3.7 andbased on mapping provided by the Conservation Authorities.7.2.2 Run<strong>of</strong>f quality and quantity shall be addressed for all storm events.7.2.3 Due to historic development in the floodplain in the existing shoreline and settlementareas along Lake Simcoe and Cooks Bay, releasing <strong>of</strong> water from upstreamstormwater management ponds can lead to flooding downstream through the existingcommunities. In such areas, the municipality will explore means <strong>of</strong> addressing thismatter through such efforts as increased stormwater detention, diversion <strong>of</strong>stormwaters or establishment <strong>of</strong> municipal drainage easements. Master Drainage<strong>Plan</strong>s for new growth areas shall also address this matter and identify means tomitigate flooding caused by stormwater management pond releases.7.2.4 All new developments shall incorporate generally accepted Best ManagementPractices, which shall be the highest level determined to be technically andeconomically feasible, and shall meet the following criteria:i) no net reduction in surficial aquifer recharge or discharge;ii) minimize potential for contamination <strong>of</strong> groundwater and surface water;iii) minimize alterations to the natural drainage boundaries;iv) no creation <strong>of</strong> new flood or erosion problems or aggravation <strong>of</strong> existing flood orerosion problems;109Adopted July 26, 2006 <strong>Approved</strong> by <strong>OMB</strong> May 2009, March 2010 & April 8, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!