12.07.2015 Views

Download - Buderus

Download - Buderus

Download - Buderus

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10Final activities10 Final activities10.1 Checking the installationNOTICECarry out the final insulating work onlyonce all necessary checks have beenperformed.Checks1.2.3.4.5.6.Solar hoses secured with hose clamps(locking ring pulled)?Screws on the collector clamp (single-sidedand double-sided) tightened?Horizontal rails connected to roof hooks andthreaded clip?Collector hanger installed and snapped inhorizontal rails?Sensor inserted as far as it will go andsecured with strain relief?Pressure test carried out and all connectionsleak-proof (see pump station instructions)?NOTICEEnsure the ball valve on the automatic airvent is closed after commissioning.10.2 Insulating the Pipes above the RoofInsulation of the pipework in internal or externalinstallations– For the insulation of external pipework, use only UVand high temperature resistant insulating materials.– For the insulation of internal pipework, use only hightemperature resistant insulating materials.– Use only material that is bird and rodent proof.– Verify all penetrations are weather proof anddiscourage critters from entering the building.38Logasol SKN 3.0 - We reserve the right to make any changes due to technical modifications.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!