534.2.8 Summary of Interventions in Infrastructure SectorInterventions & Estimated Costs by PhaseSub-Sector Relief <strong>Early</strong> <strong>Recovery</strong> <strong>Reconstruction</strong>Rubble <strong>and</strong>ERWRubble <strong>and</strong> ERW removal• Heavy machinery <strong>for</strong> MOPWH• Rubble <strong>and</strong> ERW removalEnergy:electricity, fuel,<strong>and</strong> gasWater, wastewater <strong>and</strong>sanitation• Restoration of temporary waterprovision• Water provision to IDPs• Clearance of transitional solidwaste dump sitesEstimated Cost: $20m Estimated Cost: $14m• Restoration of power lines• Equipment <strong>for</strong> network repair• Alternative temporary electricitygeneration• New supply line from Israel• Restoring transmission system• New storage facilityEstimated Cost: $32m Estimated Cost: $153m• Restore PWA/CMWU capacity• Continued restoration oftemporary water provision• Continued water provision to IDPs• Rehabilitation of water <strong>and</strong>wastewater infrastructure• Rehabilitation of solid wastedisposal capacity• Restoration of PWA/CMWUcapacity• Continued rehabilitation of water<strong>and</strong> wastewater infrastructure• Procurement of water from Israel(15MCM/year)Housing <strong>and</strong>ShelterPublicBuildingsRoadsEstimated Cost: $40m Estimated Cost: $80m Estimated Cost: $116m• Rental subsidy/host familysupport <strong>for</strong> those withuninhabitable housing• One-time household itemsallowance <strong>for</strong> those withuninhabitable housing• Temporary shelter solutions <strong>for</strong>those with uninhabitable housing• Assessment <strong>and</strong> compensation<strong>for</strong> repair of damaged houses• <strong>Reconstruction</strong> of houses• Repair of severely damagedhousesEstimated Cost: $129m Estimated Cost: $143m Estimated Cost: $910m• Temporary location <strong>and</strong> furniture<strong>for</strong> affected ministries• Repairs of UNRWA installations• <strong>Reconstruction</strong> of 106 publicbuildings• Rehabilitation of lighting• Rehabilitation of recreational sites(parks, sports facilities)Estimated Cost: $51m Estimated Cost: $97m• Road repairBorderCrossings• Initial limited operation ofcrossingsEstimated Cost: $70m• Rehabilitation of border crossingsEnvironmentESTIMATEDSUB-SECTORCOSTTOTAL SECTORCOSTEstimated Cost: $5m Estimated Cost: $50m• Environmental damage <strong>and</strong>hazardous waste managementassessmentEstimated Cost: $ 1m$169m $332m $1,411m$1.9b

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!