12.07.2015 Views

National Early Recovery and Reconstruction Plan for Gaza 2014-2017_FINAL

National Early Recovery and Reconstruction Plan for Gaza 2014-2017_FINAL

National Early Recovery and Reconstruction Plan for Gaza 2014-2017_FINAL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

48The <strong>National</strong> <strong>Early</strong> <strong>Recovery</strong> <strong>and</strong> <strong>Reconstruction</strong> <strong>Plan</strong> <strong>for</strong> <strong>Gaza</strong> <strong>2014</strong>SECTION 4: RECOVERY AND RECONSTRUCTION INTERVENTIONS4.2 Infrastructure SectorImmediate response, as part of the relief <strong>and</strong> early recovery ef<strong>for</strong>t, is essential to ease individual suffering <strong>and</strong> increaseaccess to basic services. However, given that <strong>Gaza</strong>’s infrastructure was already at breaking point prior to the assault,short term fixes cannot evolve into long-term solutions. Equally, the infrastructure reconstruction ef<strong>for</strong>t cannot simplybe a re-building of pre-existing infrastructure. Instead, reconstruction ef<strong>for</strong>ts will be in<strong>for</strong>med by long-term, cross-sectorinfrastructure planning that will establish effective integrated infrastructure networks as the basis <strong>for</strong> long-term sustainablesocial <strong>and</strong> economic development.A critical pre-requisite <strong>for</strong> infrastructure development is access <strong>and</strong> movement. Even the most urgent need or the most strategicpriority cannot be met if the blockade is not ended. Without materials <strong>and</strong> fuel, networks cannot be mended, houses cannot bebuilt, <strong>and</strong> a healthy <strong>and</strong> sustainable future cannot be assured4.2.1 Clearance of Rubble <strong>and</strong> Explosive Remnants of WarRelief <strong>Early</strong> <strong>Recovery</strong> <strong>Reconstruction</strong> Total- $20m $14m $34mTwo <strong>and</strong> a half million tons of rubble need to be removed, the mass clearance can be divided between the early recovery phase<strong>and</strong> the reconstruction phase. Although it is not suitable <strong>for</strong> rebuilding, the rubble removed during the reconstruction phasecan be reused <strong>for</strong> road rehabilitation, curbs stones, <strong>and</strong> road paving. Large chunks of concrete can be reused as wave breakers<strong>for</strong> the fishing harbor.Given the high tonnage of munitions used during this assault <strong>and</strong> the December 2008 assault, there is a significant risk that ERWswill be hidden in the rubble. Activities will include rapid assessments, emergency ERW (<strong>and</strong> explosive hazards) risk education<strong>for</strong> civilians <strong>and</strong> humanitarian actors in highly impacted neighborhoods, as well as the oversight <strong>and</strong> monitoring of marking,collection, <strong>and</strong> disposal of ERW by the Police EOD teams as <strong>and</strong> when the security <strong>and</strong> political situations allow. Activities wouldbegin in the early recovery phase <strong>and</strong> continue through the reconstruction phase.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!