12.07.2015 Views

National Early Recovery and Reconstruction Plan for Gaza 2014-2017_FINAL

National Early Recovery and Reconstruction Plan for Gaza 2014-2017_FINAL

National Early Recovery and Reconstruction Plan for Gaza 2014-2017_FINAL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

42The <strong>National</strong> <strong>Early</strong> <strong>Recovery</strong> <strong>and</strong> <strong>Reconstruction</strong> <strong>Plan</strong> <strong>for</strong> <strong>Gaza</strong> <strong>2014</strong>SECTION4RECOVERY ANDRECONSTRUCTIONINTERVENTIONSRelief activities are already underway to respond to humanitarian needs <strong>and</strong>increase availability of essential services. The interventions outlined below buildupon ongoing <strong>and</strong> planned relief activities <strong>and</strong> are designed to be an effectivebridge between current critical needs <strong>and</strong> a more sustainable response to new<strong>and</strong> chronic needs in <strong>Gaza</strong>. This is particularly important because of the decline inthe quality of services <strong>and</strong> economic conditions be<strong>for</strong>e the July/August assault.In order to address the needs of people in <strong>Gaza</strong> in an integrated <strong>and</strong> coordinatedway, priority interventions must ensure that sectoral <strong>and</strong> sub-sectoral needs areconsidered in relation to each other. Interventions in one sector will rein<strong>for</strong>ce thosein others. For example, an improved supply of energy will increase availability ofwater <strong>and</strong> sanitation services, improving living conditions (particularly <strong>for</strong> IDPs),reducing public health risks, <strong>and</strong> protecting the vulnerable (such as women <strong>and</strong>children). Energy is also critical to reviving the private sector, which will be animportant supply <strong>and</strong> employment resource during recovery <strong>and</strong> reconstruction.The sequencing <strong>and</strong> prioritization of recovery <strong>and</strong> reconstruction activitiesrecommended below is a result of the careful consideration of the various subsectorsof the <strong>Plan</strong>.11.Social Sector22.Infrastructure Sector33.Economic Sector44.Governance Sector

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!