12.07.2015 Views

Manitowoc

Manitowoc

Manitowoc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SM50INITIAL START-UP OR START-UP AFTERAUTOMATIC SHUT-OFFSequence of OperationBin thermostat and the optional drain pump safetyswitch must be closed before the ice machine willstart.1. Initial Start-up or Start-up After AutomaticShut-off – Water FillBefore the compressor starts, the water pump, waterinlet valve and hot gas valve are energized for about 3minutes.2. Refrigeration System Start-upThe compressor starts after the water fill, and remainson throughout the Freeze and Harvest cycles. The hotgas valve remains on for 5 seconds during initialcompressor start-up and then shuts off.At the same time the compressor starts, thecondenser fan motor (air-cooled models) is suppliedwith power. The condenser fan motor will remainenergized during the entire freeze cycle.3. FreezeThe water pump sprays water into the inverted cups.The water freezes layer by layer, until an ice cubeforms in each cup. The control system monitors thetemperature of the refrigeration system liquid line todetermine the length of the freeze cycle.86 Part Number 80-01111-9 7/10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!