12.07.2015 Views

Manitowoc

Manitowoc

Manitowoc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

QM20/QM30INITIAL START-UP OR START-UP AFTERAUTOMATIC SHUT-OFF1. Water PurgeThe water fill valve and the hot gas valve areenergized for 2.9 minutes (175 seconds). This ensuresthat the ice making cycle starts with fresh water, andthat the refrigerant pressures are equalized prior torefrigeration system start-up.2. Refrigeration System Start-upThe compressor starts 2.9 minutes (175 seconds)after the water fill valve and hot gas valve areenergized. (The water fill valve and hot gas valveremain energized for 5 seconds during compressorstart-up, and then shut off.) The compressor remainson throughout the entire freeze and harvest cycles.FREEZE SEQUENCE3. Freeze CycleThe condenser fan motor and water pump areenergized and remain on throughout the entire freezecycle. An even flow of water is directed across theevaporator and into each cube cell, where it freezes.The control system automatically determines thelength of the freeze cycle by monitoring thetemperature of the refrigeration system liquid line.Part Number 80-01111-9 7/10 83

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!