12.07.2015 Views

Manitowoc

Manitowoc

Manitowoc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PROCEDUREStep 1 Complete each item individually in the“Operational Analysis” column.Enter check marks (✓) in the boxes.Each time the actual findings of an item in the“Operational Analysis” column matches the publishedfindings on the table, enter a check mark.Example: Freeze cycle suction pressure is determinedto be low. Enter a check mark in the “low” box.Perform the procedures and check all informationlisted. Each item in this column has supportingreference material.While analyzing each item separately, you may find an“external problem” causing a good refrigerantcomponent to appear bad. Correct problems as theyare found. If the operational problem is found, it isnot necessary to complete the remainingprocedures.Step 2 Add the check marks listed under each of thefour columns. Note the column number with thehighest total and proceed to “Final Analysis.”NOTE: If two columns have matching high numbers, aprocedure was not performed prope rly and/orsupporting material was not analyzed correctly.Part Number 80-01111-9 7/10 129

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!