INDUSTRIAL LAND USE STRATEGY - City of Darebin
INDUSTRIAL LAND USE STRATEGY - City of Darebin INDUSTRIAL LAND USE STRATEGY - City of Darebin
SPECIFIC SITESDesign guidelines are recommended for key sites and precincts including:Properties between AustraliaPost and High Street &between Raglan St, High Stand Plenty Rd• Opportunity for larger scaledevelopment comprisingcommercial, industrial andresidential.• Landscaped setbacks to frontagesand setbacks at corners to enablefeature specimen trees to beincluded.Inclusion of buildings of up to sixstories based on careful design andsiting.Otto Wurth site• Improve image of propertiesaround the intersection.• Opportunities to link surroundingretail components.• Conversion of the car sales yardto a retail use that includes a smallcivic space.• Better integration of the stratatitled shops near Safeway andimproving access into Safeway carpark.Land between Oakover Roadand Warrs Avenue• Opportunity for medium-densityresidential dwellings orientednorthwards, with the rearsproviding car access to screenhabitable areas from AustraliaPost operations.New on-street car parking forindustrial uses• Develop car parking areas at theentrances to residential streetssuch as Showers, Adeline andGertrude Streets to protectresidential streets from nonresidentialtraffic and increase carparking capacity.Railway Place East• Improve access to residentialblocks by extending and wideningRailway Place East.• Residential development on landsurplus to rail needs.Howe Leather• Opportunity to use upper levels forresidential.URBAN DESIGNA range of urban design improvements have been identified. These extendacross the public and private realm and could be introduced progressively,some as discreet projects and some in associate with property redevelopments.The Junction Integrated Development Plan - Executive Summary
IMPLEMENTATION STRATEGYPLANNING SCHEME CONTROLSThe Industrial 3 zone is no longer the appropriate zone for most of theland within the study area. It is recommended that most of the land inthe Industrial 3 zone be re-zoned to Business 2 zone.This zone allows a wide range of uses to be approved, including offices, industry,residential and retail. Of all the zones that could be applied to facilitate a mix of uses,this zone would give Council the widest possible degree of discretion. In this regard itdoes not have the shortcomings of the Mixed Use Zone, in which a dwelling is aSection 1 (permitted) use.It will be important to apply development criteria via a design development overlay.This will provide a flexible mechanism for introducing development guidelines within aschedule to the overlay for the critical sites. These guidelines should address detailssuch as heights, setbacks and landscape treatments as detailed within Section 5.3.3of the report.RECOMMENDATIONSA major conclusion of this study is that there is a need to amend DarebinPlanning Scheme to facilitate land use changes to better meet the changed role ofthe area.RECOMMENDATION 1The recommendations of the Junction Integrated Development Plan beincorporated into and inform the review of the Darebin Municipal StrategicStatement (MSS).RECOMMENDATION 2A Junction Area Local Policy be included in Clause 22 of the Darebin PlanningScheme to provide a comprehensive overview of the recommendations of thestudy and to provide clear direction for land owners, tenants and anyprospective purchasers.RECOMMENDATION 3The objectives of the Junction Area Local Policy are to:• Enhance the existing commercial spine along High Street and PlentyRoad by encouraging a mix of uses.• Improve the amenity of High Street and Plenty Road.
- Page 1: CITY OF DAREBININDUSTRIAL LAND USES
- Page 5 and 6: Contents1 INTRODUCTION ............
- Page 7 and 8: 2 GENERAL PRINCIPLES2.1 Existing po
- Page 9 and 10: 3 CHANGES IN THE DAREBIN ECONOMYThe
- Page 11 and 12: 3.3 ConclusionWhilst change is happ
- Page 13 and 14: 4.1.1 Core Industrial AreasThe Core
- Page 15 and 16: Scheme, and does not adversely affe
- Page 17 and 18: 4.3 Zoning StrategyThe following ta
- Page 19 and 20: Map Description Current Zone/Use Fu
- Page 21 and 22: 4.5 Contributions toDevelopmentCoun
- Page 23 and 24: 4.5.3 Development Contributions Pla
- Page 25 and 26: Minimisation of the impact on the a
- Page 27 and 28: PPYes6.2 Rezoning RequestsThe Indus
- Page 29 and 30: and provide an increased residentia
- Page 31 and 32: 6.3 Permit ApplicationsWhen permit
- Page 33 and 34: 8 RECOMMENDATIONS1. That the key pr
- Page 35: APPENDIX 1DESCRIPTION OF ZONESTo ai
- Page 38 and 39: APPENDIX 2MAPS TO THE INDUSTRIAL ZO
- Page 40 and 41: PDecemberAPPENDIX 4 EXECUTIVE SUMMA
- Page 42 and 43: STRENGTHS AND WEAKNESSESThe study p
- Page 46 and 47: • Improve linkages between Presto
- Page 48: For further information please cont
IMPLEMENTATION <strong>STRATEGY</strong>PLANNING SCHEME CONTROLSThe Industrial 3 zone is no longer the appropriate zone for most <strong>of</strong> theland within the study area. It is recommended that most <strong>of</strong> the land inthe Industrial 3 zone be re-zoned to Business 2 zone.This zone allows a wide range <strong>of</strong> uses to be approved, including <strong>of</strong>fices, industry,residential and retail. Of all the zones that could be applied to facilitate a mix <strong>of</strong> uses,this zone would give Council the widest possible degree <strong>of</strong> discretion. In this regard itdoes not have the shortcomings <strong>of</strong> the Mixed Use Zone, in which a dwelling is aSection 1 (permitted) use.It will be important to apply development criteria via a design development overlay.This will provide a flexible mechanism for introducing development guidelines within aschedule to the overlay for the critical sites. These guidelines should address detailssuch as heights, setbacks and landscape treatments as detailed within Section 5.3.3<strong>of</strong> the report.RECOMMENDATIONSA major conclusion <strong>of</strong> this study is that there is a need to amend <strong>Darebin</strong>Planning Scheme to facilitate land use changes to better meet the changed role <strong>of</strong>the area.RECOMMENDATION 1The recommendations <strong>of</strong> the Junction Integrated Development Plan beincorporated into and inform the review <strong>of</strong> the <strong>Darebin</strong> Municipal StrategicStatement (MSS).RECOMMENDATION 2A Junction Area Local Policy be included in Clause 22 <strong>of</strong> the <strong>Darebin</strong> PlanningScheme to provide a comprehensive overview <strong>of</strong> the recommendations <strong>of</strong> thestudy and to provide clear direction for land owners, tenants and anyprospective purchasers.RECOMMENDATION 3The objectives <strong>of</strong> the Junction Area Local Policy are to:• Enhance the existing commercial spine along High Street and PlentyRoad by encouraging a mix <strong>of</strong> uses.• Improve the amenity <strong>of</strong> High Street and Plenty Road.