ReSl. SNo t. aName of Transmission Lines No. ofCircuitsTotal Length(CKm)Target (CkM) TargetMonthQtr1 Qtr2 Qtr3 Qtr4Power 2 nd LILO Grid of Mejia-Kalyaneswari (PGCIL) at BurnpurS/S(AAAC,61/3.31)D/C 37 37 Sep-11DVC 220 kV Total 529 0 443 86 0 Jan-00Jan-00DVC 400 + 220 kV Total 971 141 443 387 0 Jan-00Total Centor Sector 8159 1095 1923 1993 3148 Jan-00Jan-00SJan-00NJan-001 DELHI (DTL) 400 kV0 Jan-00220 kV Jan-00SJan-00Maharani Bagh- Gazipur (0.5kM cable on MaharaniBagh side & 8.5kM OH line)D/C 19 19 Sep-11LILO of Kanjhawala-Najafgarh at Mundka 400kV s/s D/C 22 22 Dec-11U/G Shalimar bagh - Wazirpur, 1000 mm, 200MW D/C 9 9 Oct-11U/G Wazirpur-Peeragarhi, 1000 mm,200 MW D/C 20 20 Jan-12U/G Peeragarhi - Mundka 1200 mm, 250 MW D/C 26 26 Jan-12TOTAL (DTL) 220 kV 96 0 19 31 46 Jan-00TOTAL (DTL) 400 + 220 kV 96 0 19 31 46 Jan-002 HARYANA (HVPNL):Jan-00400 kV Jan-00System SrengtheningJan-00LILO of Hissar- Fatehabad at Nuhiawali D/C 153 153 Dec-11TOTAL (HVPNL) 400kV 153 0 0 153 0 Jan-00220 kV Jan-00System StrengtheningJan-00Gurgaon Sector-72- Gurgaon Sec-56 (S M) D/C 21 21 Aug-11Fatehabad-Chormar D/C 158 158 Oct-11Mohana-Smalkha D/C 55 55 Jan-00Rangala Raipur-Palwal line D/C 102 102 Sep-11Masudpur-Samain line D/C 100 100 Jan-12TOTAL (HVPNL) 220 kV 436 55 123 158 100 Jan-00TOTAL (HVPNL) 400 + 220 kV 589 55 123 311 100 Jan-003 HIMACHAL PRADESH (HPSEB Ltd.) :Jan-00400 kV NIL 0 Jan-00220 kV Jan-00ATS of Kashang - I HEP 2x33 MW Jan-00Kashang-Bhaba D/C 76 76 May-11System StrengtheningJan-00Baddi-Nalagarh D/C 24 24 Jul-11TOTAL (HPSEB Ltd.) 220 kV 100 76 24 0 0 Jan-00TOTAL (HPSEB Ltd.) 400 + 220 kV 100 76 24 0 0 Jan-004 JAMMU & KASHMIR (J&K) :Jan-00400 kV NIL 0 Jan-00220 kV Jan-00System StrengtheningJan-00Zainkote-Amargarh D/C 85 85 Jan-12Barn-Bishnah-Hira Nagar D/C 165 165 Oct-11Miran Sahib - Bishnah D/C 19 19 Jul-11TOTAL (J&K) 220 kV 269 0 19 165 85 Jan-004/10

ReSl. SNo t. aName of Transmission Lines No. ofCircuitsTotal Length(CKm)Target (CkM) TargetMonthQtr1 Qtr2 Qtr3 Qtr4Power Grid (PGCIL) TOTAL (J&K) 400 + 220 kV 269 0 19 165 85 Jan-005 PUNJAB (PSTCL) :Jan-00400 kV NIL 0 Jan-00220 kV Jan-00System StrengtheningJan-00Bottianwala-Masterwala line S/C on D/C 12 12 Jul-11Sarana- Kotli Surat Malli line S/C on D/C 62 62 Oct-11Total Punjab (PSTCL) 220 kV 74 0 12 62 0 Jan-00Total Punjab (PSTCL) 400 kV + 220 kV 74 0 12 62 0 Jan-006 RAJASTHAN (RRVPNL)Jan-00400 kV NIL 0 Jan-00ATS of Wind Power Generation (1890 MW)Jan-00Jaisalmer-Jodhpur S/C 251 251 Jun-11Total 400 kV of RRVPNL 251 251 0 0 0 Jan-00220 kV Jan-00ATS of Rajwest TPSJan-00Rajwest-Dhorimanna S/C 100 100 Oct-11System StrengtheningJan-00LILO of Debari – Banswara at Madri (Udaipur) D/C 32 32 Jun-11Mandawar -Alwar MIA line S/C 58 58 Sep-11LILO of Sirohi-Bhinmal at Bhinwal GSS (PG) D/C 10 10 Apr-11LILO of Bhiwadi-Alwar line at Kishangarh S/C 5 5 May-11Bhadra-Chirwa Line S/C 125 125 Oct-11220 kV D/C line to connect the LILO of 220 kV S/C D/C 125 125 Jan-12Heerapura-Khetri line(second ckt.) to LILO of oneckt. of 220 kV D/C Neemrana- Kotputli lineLILO of Chittorgarh-Nimbahera line at Sawa. D/C 5 5 Jan-00TOTAL (RRVPNL) 220 kV 460 52 58 225 125 Jan-00TOTAL (RRVPNL) 400 + 220 kV 711 303 58 225 125 Jan-007 UTTAR PRADESH (UPPCL) :Jan-00765 kV Jan-00ATS of Anpara-CJan-00Shifting of Anpara-B - Unnao termination piont from1 1 Jun-11Anpara-B to Anpara-CShifting of Anpara-B - Unnao termination piont at1 1 Jun-11UnnaoTOTAL (UPPCL) 765kV 2 2 0 0 0 Jan-00400 kV Jan-00ATS of Parichha TPS (2x250MW)Jan-00Parichha - Orai D/C 200 200 Oct-11Orai - Mainpuri D/C 280 280 Jan-12TOTAL (UPPCL) 400kV 480 0 0 200 280 Jan-00220 kV Jan-00ATS of Harduaganj TPSJan-00Harduaganj - Jahangirabad D/C 80 80 Sep-11ATS of Parichha TPS (2x250MW)Jan-00parichha - Banda Part I S/C 208 208 Jun-11System StrengteningJan-00Sarnath-Gajokhar D/C 25 25 Jul-11Gajokhar-Jaunpur D/C 35 35 Aug-11Parichha-Jhansi D/C 28 28 Jun-11Gokul-Mitai(Hathras) S/C 41 41 Oct-11LILO of panki-Uanno at Bithoor S/C 14 14 Jun-11Greater Noida - IT City Garbera S/C 17 17 Jun-11Greater Noida- Noida Sector 129 D/C 24 24 Jun-115/10

ReSl. SNo t. aName of <strong>Transmission</strong> <strong>Lines</strong> No. ofCircuitsTotal Length(CKm)Target (CkM) TargetMonthQtr1 Qtr2 Qtr3 Qtr4Power Grid (PGCIL) TOTAL (J&K) 400 + 220 kV 269 0 19 165 85 Jan-005 PUNJAB (PSTCL) :Jan-00400 kV NIL 0 Jan-00220 kV Jan-00System StrengtheningJan-00Bottianwala-Masterwala line S/C on D/C 12 12 Jul-11Sarana- Kotli Surat Malli line S/C on D/C 62 62 Oct-11Total Punjab (PSTCL) 220 kV 74 0 12 62 0 Jan-00Total Punjab (PSTCL) 400 kV + 220 kV 74 0 12 62 0 Jan-006 RAJASTHAN (RRVPNL)Jan-00400 kV NIL 0 Jan-00ATS of Wind Power Generation (1890 MW)Jan-00Jaisalmer-Jodhpur S/C 251 251 Jun-11Total 400 kV of RRVPNL 251 251 0 0 0 Jan-00220 kV Jan-00ATS of Rajwest TPSJan-00Rajwest-Dhorimanna S/C 100 100 Oct-11System StrengtheningJan-00LILO of Debari – Banswara at Madri (Udaipur) D/C 32 32 Jun-11Mandawar -Alwar MIA line S/C 58 58 Sep-11LILO of Sirohi-Bhinmal at Bhinwal GSS (PG) D/C 10 10 Apr-11LILO of Bhiwadi-Alwar line at Kishangarh S/C 5 5 May-11Bhadra-Chirwa Line S/C 125 125 Oct-11220 kV D/C line to connect the LILO of 220 kV S/C D/C 125 125 Jan-12Heerapura-Khetri line(second ckt.) to LILO of oneckt. of 220 kV D/C Neemrana- Kotputli lineLILO of Chittorgarh-Nimbahera line at Sawa. D/C 5 5 Jan-00TOTAL (RRVPNL) 220 kV 460 52 58 225 125 Jan-00TOTAL (RRVPNL) 400 + 220 kV 711 303 58 225 125 Jan-007 UTTAR PRADESH (UPPCL) :Jan-00765 kV Jan-00ATS of Anpara-CJan-00Shifting of Anpara-B - Unnao termination piont from1 1 Jun-11Anpara-B to Anpara-CShifting of Anpara-B - Unnao termination piont at1 1 Jun-11UnnaoTOTAL (UPPCL) 765kV 2 2 0 0 0 Jan-00400 kV Jan-00ATS of Parichha TPS (2x250MW)Jan-00Parichha - Orai D/C 200 200 Oct-11Orai - Mainpuri D/C 280 280 Jan-12TOTAL (UPPCL) 400kV 480 0 0 200 280 Jan-00220 kV Jan-00ATS of Harduaganj TPSJan-00Harduaganj - Jahangirabad D/C 80 80 Sep-11ATS of Parichha TPS (2x250MW)Jan-00parichha - Banda Part I S/C 208 208 Jun-11System StrengteningJan-00Sarnath-Gajokhar D/C 25 25 Jul-11Gajokhar-Jaunpur D/C 35 35 Aug-11Parichha-Jhansi D/C 28 28 Jun-11Gokul-Mitai(Hathras) S/C 41 41 Oct-11LILO of panki-Uanno at Bithoor S/C 14 14 Jun-11Greater Noida - IT City Garbera S/C 17 17 Jun-11Greater Noida- Noida Sector 129 D/C 24 24 Jun-115/10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!