12.07.2015 Views

Transmission Lines - Central Electrical Authority

Transmission Lines - Central Electrical Authority

Transmission Lines - Central Electrical Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ReSl. SNo t. aName of <strong>Transmission</strong> <strong>Lines</strong> No. ofCircuitsTotal Length(CKm)Target (CkM) TargetMonthQtr1 Qtr2 Qtr3 Qtr4Power <strong>Transmission</strong> Grid (PGCIL) System Associated with RAMPURAJan-00HEP.Patiala - Ludhiana line D/C 156 156 Jan-12LILO of Patiala - Hissar line at Kaithal D/C 66 66 Nov-11Northern Region System Strengthening Scheme -Jan-00XIVLILO of Nalagarh - Kaithal at Patiala D/C 22 22 Oct-11Western Region Strengthening Scheme - IIJan-00Raipur (PG) - Wardha (PG) line D/C 741 741 Jan-12<strong>Transmission</strong> System Associated with MundraJan-00Ultra Mega Power Project.Mundra - Bachau line (Tripal snowbard) D/C 198 198 Jun-11<strong>Transmission</strong> System Assciated with TUTICORINJan-00JV TPS.Tuticorin JV - Madurai line (Q) D/C 316 316 Feb-12System Strengthening - X of SRJan-00LILO of Nelmangla - Somanhalli at Bidadi D/C 48 48 Mar-12System Strengthening - IX of SRJan-00Mysore - Hassan line D/C 200 200 Feb-12<strong>Transmission</strong> System Associated with KORBA -Jan-00III400KV D/C Korba STPS - Raipur line D/C 424 424 Sep-11<strong>Transmission</strong> System Associated with CHAMERA- III HEP400KV D/C Pooling Station near Chamera-III HEP -Jullandhur lineJan-00D/C 324 324 Oct-11Jan-00Total PGCIL 400 kV 6320 954 1467 1606 2293 Jan-00220 kV Jan-00Supplementary <strong>Transmission</strong> System Associatedwith DVC & Maithon Right Bank ProjectJan-00LILO of Dehri - Bodhgaya line at Gaya D/C 46 46 Jan-12Total PGCIL 220 kV 46 0 0 0 46 Jan-00Jan-00Total PGCIL (765 + 400+220 )kV 7188 954 1480 1606 3148 Jan-00Jan-002 Damodar Valley Corporation (DVC)Jan-00400 kV Jan-00ATS of Raghunathpur TPS (2x600 MW)Jan-00Durgapur STS- RaghunathpurSTPS,(ACSR,54/7/3.53)D/C 141 141 Jun-11Raghunathpur TPS – Ranchi lineD/C 301 301 Dec-11(ACSR,54/7/3.53)Total 400 kV DVC 442 141 0 301 0 Jan-00Jan-00220 kV Jan-00ATS of Mejia TPS Unit -6(250 MW)Jan-00Mejia –Gola-Ramgarh line(AAAC,61/3.31) D/C 406 406 Sep-11Dhanbad-Giridih line (AAAC,61/3.31) D/C 86 86 Dec-113/10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!