ReSl. SNo t. aName of <strong>Transmission</strong> <strong>Lines</strong> No. ofCircuitsTotal Length(CKm)Target (CkM) TargetMonthQtr1 Qtr2 Qtr3 Qtr4Power <strong>Transmission</strong> Grid (PGCIL) System Associated with RAMPURAJan-00HEP.Patiala - Ludhiana line D/C 156 156 Jan-12LILO of Patiala - Hissar line at Kaithal D/C 66 66 Nov-11Northern Region System Strengthening Scheme -Jan-00XIVLILO of Nalagarh - Kaithal at Patiala D/C 22 22 Oct-11Western Region Strengthening Scheme - IIJan-00Raipur (PG) - Wardha (PG) line D/C 741 741 Jan-12<strong>Transmission</strong> System Associated with MundraJan-00Ultra Mega Power Project.Mundra - Bachau line (Tripal snowbard) D/C 198 198 Jun-11<strong>Transmission</strong> System Assciated with TUTICORINJan-00JV TPS.Tuticorin JV - Madurai line (Q) D/C 316 316 Feb-12System Strengthening - X of SRJan-00LILO of Nelmangla - Somanhalli at Bidadi D/C 48 48 Mar-12System Strengthening - IX of SRJan-00Mysore - Hassan line D/C 200 200 Feb-12<strong>Transmission</strong> System Associated with KORBA -Jan-00III400KV D/C Korba STPS - Raipur line D/C 424 424 Sep-11<strong>Transmission</strong> System Associated with CHAMERA- III HEP400KV D/C Pooling Station near Chamera-III HEP -Jullandhur lineJan-00D/C 324 324 Oct-11Jan-00Total PGCIL 400 kV 6320 954 1467 1606 2293 Jan-00220 kV Jan-00Supplementary <strong>Transmission</strong> System Associatedwith DVC & Maithon Right Bank ProjectJan-00LILO of Dehri - Bodhgaya line at Gaya D/C 46 46 Jan-12Total PGCIL 220 kV 46 0 0 0 46 Jan-00Jan-00Total PGCIL (765 + 400+220 )kV 7188 954 1480 1606 3148 Jan-00Jan-002 Damodar Valley Corporation (DVC)Jan-00400 kV Jan-00ATS of Raghunathpur TPS (2x600 MW)Jan-00Durgapur STS- RaghunathpurSTPS,(ACSR,54/7/3.53)D/C 141 141 Jun-11Raghunathpur TPS – Ranchi lineD/C 301 301 Dec-11(ACSR,54/7/3.53)Total 400 kV DVC 442 141 0 301 0 Jan-00Jan-00220 kV Jan-00ATS of Mejia TPS Unit -6(250 MW)Jan-00Mejia –Gola-Ramgarh line(AAAC,61/3.31) D/C 406 406 Sep-11Dhanbad-Giridih line (AAAC,61/3.31) D/C 86 86 Dec-113/10


ReSl. SNo t. aName of <strong>Transmission</strong> <strong>Lines</strong> No. ofCircuitsTotal Length(CKm)Target (CkM) TargetMonthQtr1 Qtr2 Qtr3 Qtr4Power 2 nd LILO Grid of Mejia-Kalyaneswari (PGCIL) at BurnpurS/S(AAAC,61/3.31)D/C 37 37 Sep-11DVC 220 kV Total 529 0 443 86 0 Jan-00Jan-00DVC 400 + 220 kV Total 971 141 443 387 0 Jan-00Total Centor Sector 8159 1095 1923 1993 3148 Jan-00Jan-00SJan-00NJan-001 DELHI (DTL) 400 kV0 Jan-00220 kV Jan-00SJan-00Maharani Bagh- Gazipur (0.5kM cable on MaharaniBagh side & 8.5kM OH line)D/C 19 19 Sep-11LILO of Kanjhawala-Najafgarh at Mundka 400kV s/s D/C 22 22 Dec-11U/G Shalimar bagh - Wazirpur, 1000 mm, 200MW D/C 9 9 Oct-11U/G Wazirpur-Peeragarhi, 1000 mm,200 MW D/C 20 20 Jan-12U/G Peeragarhi - Mundka 1200 mm, 250 MW D/C 26 26 Jan-12TOTAL (DTL) 220 kV 96 0 19 31 46 Jan-00TOTAL (DTL) 400 + 220 kV 96 0 19 31 46 Jan-002 HARYANA (HVPNL):Jan-00400 kV Jan-00System SrengtheningJan-00LILO of Hissar- Fatehabad at Nuhiawali D/C 153 153 Dec-11TOTAL (HVPNL) 400kV 153 0 0 153 0 Jan-00220 kV Jan-00System StrengtheningJan-00Gurgaon Sector-72- Gurgaon Sec-56 (S M) D/C 21 21 Aug-11Fatehabad-Chormar D/C 158 158 Oct-11Mohana-Smalkha D/C 55 55 Jan-00Rangala Raipur-Palwal line D/C 102 102 Sep-11Masudpur-Samain line D/C 100 100 Jan-12TOTAL (HVPNL) 220 kV 436 55 123 158 100 Jan-00TOTAL (HVPNL) 400 + 220 kV 589 55 123 311 100 Jan-003 HIMACHAL PRADESH (HPSEB Ltd.) :Jan-00400 kV NIL 0 Jan-00220 kV Jan-00ATS of Kashang - I HEP 2x33 MW Jan-00Kashang-Bhaba D/C 76 76 May-11System StrengtheningJan-00Baddi-Nalagarh D/C 24 24 Jul-11TOTAL (HPSEB Ltd.) 220 kV 100 76 24 0 0 Jan-00TOTAL (HPSEB Ltd.) 400 + 220 kV 100 76 24 0 0 Jan-004 JAMMU & KASHMIR (J&K) :Jan-00400 kV NIL 0 Jan-00220 kV Jan-00System StrengtheningJan-00Zainkote-Amargarh D/C 85 85 Jan-12Barn-Bishnah-Hira Nagar D/C 165 165 Oct-11Miran Sahib - Bishnah D/C 19 19 Jul-11TOTAL (J&K) 220 kV 269 0 19 165 85 Jan-004/10


ReSl. SNo t. aName of <strong>Transmission</strong> <strong>Lines</strong> No. ofCircuitsTotal Length(CKm)Target (CkM) TargetMonthQtr1 Qtr2 Qtr3 Qtr4Power Grid (PGCIL) TOTAL (J&K) 400 + 220 kV 269 0 19 165 85 Jan-005 PUNJAB (PSTCL) :Jan-00400 kV NIL 0 Jan-00220 kV Jan-00System StrengtheningJan-00Bottianwala-Masterwala line S/C on D/C 12 12 Jul-11Sarana- Kotli Surat Malli line S/C on D/C 62 62 Oct-11Total Punjab (PSTCL) 220 kV 74 0 12 62 0 Jan-00Total Punjab (PSTCL) 400 kV + 220 kV 74 0 12 62 0 Jan-006 RAJASTHAN (RRVPNL)Jan-00400 kV NIL 0 Jan-00ATS of Wind Power Generation (1890 MW)Jan-00Jaisalmer-Jodhpur S/C 251 251 Jun-11Total 400 kV of RRVPNL 251 251 0 0 0 Jan-00220 kV Jan-00ATS of Rajwest TPSJan-00Rajwest-Dhorimanna S/C 100 100 Oct-11System StrengtheningJan-00LILO of Debari – Banswara at Madri (Udaipur) D/C 32 32 Jun-11Mandawar -Alwar MIA line S/C 58 58 Sep-11LILO of Sirohi-Bhinmal at Bhinwal GSS (PG) D/C 10 10 Apr-11LILO of Bhiwadi-Alwar line at Kishangarh S/C 5 5 May-11Bhadra-Chirwa Line S/C 125 125 Oct-11220 kV D/C line to connect the LILO of 220 kV S/C D/C 125 125 Jan-12Heerapura-Khetri line(second ckt.) to LILO of oneckt. of 220 kV D/C Neemrana- Kotputli lineLILO of Chittorgarh-Nimbahera line at Sawa. D/C 5 5 Jan-00TOTAL (RRVPNL) 220 kV 460 52 58 225 125 Jan-00TOTAL (RRVPNL) 400 + 220 kV 711 303 58 225 125 Jan-007 UTTAR PRADESH (UPPCL) :Jan-00765 kV Jan-00ATS of Anpara-CJan-00Shifting of Anpara-B - Unnao termination piont from1 1 Jun-11Anpara-B to Anpara-CShifting of Anpara-B - Unnao termination piont at1 1 Jun-11UnnaoTOTAL (UPPCL) 765kV 2 2 0 0 0 Jan-00400 kV Jan-00ATS of Parichha TPS (2x250MW)Jan-00Parichha - Orai D/C 200 200 Oct-11Orai - Mainpuri D/C 280 280 Jan-12TOTAL (UPPCL) 400kV 480 0 0 200 280 Jan-00220 kV Jan-00ATS of Harduaganj TPSJan-00Harduaganj - Jahangirabad D/C 80 80 Sep-11ATS of Parichha TPS (2x250MW)Jan-00parichha - Banda Part I S/C 208 208 Jun-11System StrengteningJan-00Sarnath-Gajokhar D/C 25 25 Jul-11Gajokhar-Jaunpur D/C 35 35 Aug-11Parichha-Jhansi D/C 28 28 Jun-11Gokul-Mitai(Hathras) S/C 41 41 Oct-11LILO of panki-Uanno at Bithoor S/C 14 14 Jun-11Greater Noida - IT City Garbera S/C 17 17 Jun-11Greater Noida- Noida Sector 129 D/C 24 24 Jun-115/10


ReSl. SNo t. aName of <strong>Transmission</strong> <strong>Lines</strong> No. ofCircuitsTotal Length(CKm)Target (CkM) TargetMonthQtr1 Qtr2 Qtr3 Qtr4Power Grid (PGCIL) TOTAL ( UPPCL) 220 kV 472 291 140 41 0 Jan-00TOTAL ( UPPCL) 765+400 + 220 kV 954 293 140 241 280 Jan-008 UTTARAKHAND (PTCUL)Jan-00400 kV NIL 0 Jan-00220 kV Jan-00ATS of Bhilangana I,II,IIIJan-00Bhilangana III - Ghansali (Guttu) D/C 38 38 Sep-11System SrengtheningJan-00Mauaganj-Kashipur D/C 34 34 Oct-11LILO of Khodri-Rishikesh at Dehradun D/C 10 10 Oct-11LILO of Baramwari-Srinagar at Singoli Bhatwari D/C 5 5 Oct-11TOTAL (PTCUL) 220 kV 87 0 38 49 0 Jan-00TOTAL (PTCUL)400 + 220 kV 87 0 38 49 0 Jan-00WJan-009 CHHATTISGARH (CSPTCL) :Jan-00400 kV NIL 0 Jan-00220 kV Jan-00ATS of Korba (E) (2x250)Jan-00Korba(Darri)-Vishrampur D/C 153 153 Dec-11TOTAL (CSPTCL) 220 kV 153 0 0 153 0 Jan-00TOTAL (CSPTCL) 400 + 220 kV 153 0 0 153 0 Jan-0010 GUJARAT (GETCO) :Jan-00400 kV Jan-00ATS of Ukai Extn.(490 MW)Jan-00Ukai- Kosamba D/C 68 68 Oct-11LILO of Asoj -Ukai at Kosamba D/C 64 64 Oct-11ATS of Mundta TPS IIJan-00ATS of Essar Salaya TPS (2x600 MW)Jan-00Vadinar-Hadala D/C 226 226 Jun-11TOTAL (GETCO) 400 kV 358 226 0 132 0 Jan-00220 kV Jan-00ATS of Pipavav (2x350 MW)Jan-00LILO of Savarkundla - Mahva(otha) at Pipavav D/C 93 93 Jun-11(GPPC) (line-1)LILO of Savarkundla - Mahva (Otha) at Pipavav D/C 83 83 Sep-11(GPPC)(line-2)Pipavav - Dhokadva D/C 100 100 Sep-11ATS of Utran CCGTJan-00Utran - Kosamba Line- II D/C 86 86 Sep-11System StrengtheningJan-00LILO of Halvad-Morbi I at Bhachau D/C 215 215 Jan-12LILO of Halvad-Morbi II at Bhachau D/C 210 210 Jan-12Kosamba-Zagadia line D/C 49 49 Jan-12Nakhatrana-Varsana line D/C 213 213 Dec-11TOTAL (GETCO) 220 kV 1049 93 269 213 474 Jan-00TOTAL (GETCO) 400 + 220 kV 1407 319 269 345 474 Jan-0011 GOA :Jan-00400 kV NIL 0 Jan-00220 kV Jan-00Xeldem-Cuncolim D/C 20 20 Oct-11TOTAL (GOA) 220 kV 20 0 0 20 0 Jan-00TOTAL (GOA) 400 + 220 kV 20 0 0 20 0 Jan-0012 MADHYA PRADESH (MPPTCL) :Jan-00400 kV NIL 0 Jan-006/10


ReSl. SNo t. aName of <strong>Transmission</strong> <strong>Lines</strong> No. ofCircuitsTotal Length(CKm)Target (CkM) TargetMonthQtr1 Qtr2 Qtr3 Qtr4Power 220 kVGrid (PGCIL)Jan-00System StrengtheningJan-00Dewas - Astha D/C 144 144 Apr-11LILO of itarsi - Narsinghpur at Chichali D/C 16 16 Jan-12TOTAL (MPPTCL) 220 kV 160 144 0 0 16 Jan-00TOTAL (MPPTCL) 400 + 220 kV 160 144 0 0 16 Jan-0013 MAHARASHTRA (MSETCL) :Jan-00400 kV Jan-00ATS of Khaperkheda TPSJan-00New KhaperKheda - Koradi (AAAC) S/C 4 4 Jun-11System StrengtheningJan-00400KV Chandrapur-II -Wardha PGCIL Via D/C 246 246 Oct-11Warora D/C (AAAC)TOTAL( MSETCL )400 kV 250 4 0 246 0 Jan-00220 kV Jan-00ATS of Bhusaval TPS Ext.(500 MW)Jan-00Bhusaval II - Amalner D/C 182 182 Sep-11System StrengtheningJan-00Chitegaon - Shendra Line D/C 43 43 Jun-11Jalna - Chikli D/C 149 149 Oct-11Parli T.P.S. - Nanded (Waghala) D/C 181 181 Sep-11Beed- Patoda line D/C 86 86 Sep-11Koradi-II-Butibori-I D/C 106 106 Jan-12Koradi-II-new Khaparhkeda D/C 29 29 Oct-11TOTAL (MSETCL) 220 kV 776 43 449 178 106 Jan-00TOTAL (MSETCL) 400 + 220 kV 1026 47 449 424 106 Jan-0014 Andhra Pradesh Power <strong>Transmission</strong> Corporation Ltd. (APTRANSCO) Jan-00400 kV0 Jan-00NIL220 kV Jan-00System StrengtheningJan-00Palamaneru- Chitoor S/C on D/C 60 60 Jun-11Oglapur 400 S/S - Durshed D/C 142 142 Dec-11LILO of Tadikanda-Ongoliat at Poddili DC 144 144 Jan-12LILO of Renigunta Chittoor at Nagari DC 75 75 Dec-11Malakaram - Gunrock SSDC UG 34 34 Sep-11cableChandrayanagutta SS- lmiliban (GIS) SS DC UG 22 22 Sep-11cableMoulali - Osmani University (Chilakalaguda) DC UG 18 18 Oct-11SScableLILO of Shapur Nagar -Gachilbowli feeder at DC UG 19 19 Oct-11GIS Erragadda SScableTotal APTRANSCO 220 kV 514 60 56 254 144 Jan-00Total APTRANSCO 400+ 220 kV 514 60 56 254 144 Jan-0015 Karnataka Power <strong>Transmission</strong> Corporation Ltd. (KPTCL) Jan-00400 kV Jan-00Udupi TPSJan-00UTPS-Hassan (Shantigrama) Quad D/C 358 358 Jul-11Bellary TPSJan-00Bellary TPS(Kudutani)-Hiriyur(Birenahalli) D/C 313 313 Dec-11Total KPTCL 400 kV 671 0 358 313 0 Jan-007/10


ReSl. SNo t. aName of <strong>Transmission</strong> <strong>Lines</strong> No. ofCircuitsTotal Length(CKm)Target (CkM) TargetMonthQtr1 Qtr2 Qtr3 Qtr4Power 220 kVGrid (PGCIL)Jan-00Varahi HEPJan-00Varahi-Khemar in the existing 110 kV corridor D/C 226 226 Jul-11System StrengtheningJan-00RTPS-Raichur D/C 35 35 Jun-11Somananahalli Malur I &II lines -Jigani D/C 14 14 Oct-11Humnabad-Halbarga D/C 80 80 Oct-11Narendra -Mahalilngapur D/C 246 246 Oct-11LILO of Hoody- Kolar at Haskote D/C 26 26 Jun-11Total KPTCL 220 kV 627 61 226 340 0 Jan-00Total KPTCL 400 + 220 kV 1298 61 584 653 0 Jan-00Jan-0016 Jan-00Kerla State Electricity Board (KSEB)400 kV 0 Jan-00Jan-00220 kV Jan-00System StrengthingJan-00LILO of New Pallom- Kayamkulam at Punnapra D/C 40 40 Oct-11Mannukkad(Chulliar) 400 kV S/S - Kanjikode M/C 12 12 Sep-11Pothencode-Kattakkada D/C 54 54 Jan-12Total KSEB 220 kV 106 0 12 40 54 Jan-00Total KSEB 400 + 220 kV 106 0 12 40 54 Jan-0017 Tamilnadu Power <strong>Transmission</strong> Corporation Ltd. (Tantransco) Jan-00400 kV Jan-00North Chennai TPS St. IIJan-00NCTPS St.II-Alamathy M/C 168 168 Sep-11Mettur TPS Stage IIIJan-00MTPS St.III - Arasur D/C 280 280 Mar-12ATS of Vallur JV ProjectJan-00Vallur JV Project-NCTPS St.II D/C 8 8 Jun-11Total 400 kV 456 8 168 0 280 Jan-00220 kV Jan-00System StrengthingJan-00LILO of Arasur- lngur at Karamadai D/C 6 6 Jun-11Sunguvarchatram-Oragadam SC on DC 10 10 Sep-11LILO of Chekknurani-Amathapuram atD/C 30 30 Sep-11NallamanaickenpattyLILO of Sriperumbadur- Arni at Sunguvarchatram D/C 12 12 Jun-11Malumichampatty - Palladam SC on DC 53 53 Jun-11Kavanur - Karaikudi SC on DC 82 82 Aug-11Tantransco Total 220 KV 193 71 122 0 0 Jan-00Total Tantransco 400 + 220 kV 649 79 290 0 280 Jan-00Jan-0018 Bihar State Electricity Board (BSEB)Jan-00400 kV 0 Jan-00NILJan-00220 kV Jan-00System StrengthingJan-00LILO of 2nd ckt of Fatwa-Khagaul at Sipara(New)D/C 19 19 Jun-118/10


ReSl. SNo t. aName of <strong>Transmission</strong> <strong>Lines</strong> No. ofCircuitsTotal Length(CKm)Target (CkM) TargetMonthQtr1 Qtr2 Qtr3 Qtr4Power BSEB Grid Total (PGCIL) 220 kV 19 19 0 0 0 Jan-00BSEB Total 400+ 220 kV 19 19 0 0 0 Jan-0019 Orissa Power <strong>Transmission</strong> Corporation Ltd. (OPTCL) Jan-00400 kV 0 Jan-00NILJan-00220 kV Jan-00System StrengthingJan-00Bidanasi-Cuttack D/C 11 11 Dec-11LILO of Rengali-Tarkera at Bonai D/C 6 6 Oct-11OPTCL Total 220 kV 17 0 0 17 0 Jan-00OPTCL Total 400 +220 kV 17 0 0 17 0 Jan-0020 Jan-00West Bengal State Electricity<strong>Transmission</strong> Company Ltd.400 kV Jan-00System StrengthingJan-00LILO of KTPS - Baripada line at Kharagpur D/C 7 7 0 0 0 Jun-11220 kV Jan-00ATS of Santaldihi TPP U-5 (1x250 MW)Jan-00Santaldih - Bishnupur line D/C 224 224 Oct-11System StrengthingJan-00Jeerat - Rishra D/C 140 140 Oct-11WBSETCL 220 kV Total 364 0 0 364 0 Jan-00WBSETCL 220 +400 kV Total 371 7 0 364 0 Jan-00TOTAL (SS) 220 kV 5992 965 1567 2310 1150 Jan-00TOTAL (SS) 400 kV 2626 496 526 1044 560 Jan-00TOTAL (SS) 765 kV 2 2 0 0 0 Jan-00TOTAL (SS) 8620 1463 2093 3354 1710 Jan-00Jan-00Jan-00400 kV Jan-00Jan-00ATS of Tiroda TPP (2x660 MW)Jan-00Tiroda TPP- Warora (Q M) D/C 442 442 Jan-12Jan-00System Strengthening in HaryanaJan-00Mohindergarh HVDC - Mohindergarh HVPNL (QM) D/C 20 20 Oct-11Private SectorAdani Power Ltd.Jaigarh Power <strong>Transmission</strong> Ltd.(JPTL)Jan-00ATS of Jaigarh TPSJan-00Jaigad - New Karad (QM) D/C 220 220 Oct-11Jan-00ATS of BALCO TPS (4x300 MW)Jan-00LILO of Korba-Barsinghpur at BALCO TPS D/C 35 35 Jun-11Jan-00Jan-00PROJECT-BJan-00Parli(PG)-Pune(PG) D/C 646 646 Jan-12Sterlite EnergyWestern Region <strong>Transmission</strong>Western Region Strengthening Scheme-Pune(PG)-Aurangabad (MSETCL) D/C 472 472 Jan-12Parli(PG)-Solapur (PG) D/C 272 272 Sep-11Solapur(PG)-Kolhapur (MSETCL) D/C 438 438 Dec-119/10


ReSl. SNo t. aName of <strong>Transmission</strong> <strong>Lines</strong> No. ofCircuitsTotal Length(CKm)Target (CkM) TargetMonthQtr1 Qtr2 Qtr3 Qtr4Power Limbdi(Chorania((GEB)-Grid (PGCIL)D/C 206 206 Apr-11Ramchodpura(Vadavi)(GEB)Ranchodpura(Vadavi)(GEB)-D/C 280 280 Sep-11Zerda(Kansari(GEB)Jan-00Jan-00TOTAL (Private Sector) 400 kV 241 552 678 1560 Jan-00Jan-00Jan-00P220 kV 0 Jan-00TOTAL (Private SECTOR) 220 kV 0 0 0 0 Jan-00TOTAL (PRIVATE SECTOR) 400+ 220 kV241 552 678 1560 Jan-00Jan-0010/10