12.07.2015 Views

sarangpur-shujalpur road - Madhya Pradesh Road Development ...

sarangpur-shujalpur road - Madhya Pradesh Road Development ...

sarangpur-shujalpur road - Madhya Pradesh Road Development ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sarangpur-Sujalpur <strong>Road</strong>(Schedule-K)REPAIR/RECTIFICATION OF DEFECTS AND DEFICIENCIESAnnex-IThe Concessionaire shall repair and rectify the defects and deficiencies specified in thisAnnex-I of Schedule-K within the time limit set forth hereinNature of defect or deficiencyTime limit for Repair/rectificationROADS(a)Carriageway and paved shoulders(i) Breach or blockade - Temporary restoration ofTraffic within 24 hours; permanentrestoration within 15 days(ii) Roughness value exceeding 3000 - 180 daysmm in a stretch of 1km (as measuredby a standardized Vehicle mountedROMDAS system Rougho meter/BumpIntegrator)(iii) Characteristic deflection as per IRC-81-1997- Every year afterrainy season(iv) Pot holes - 48 hours(v) Cracking in more than 5% of <strong>road</strong> - 30 daysSurface in a stretch of 1 km(vi) Rutting 10mm in more than 2% of - 30 days<strong>road</strong> surface in a stretch of 1 km(measured with 3 m straight edge)(vii) Bleeding/skidding - 7 days(viii) Raveling/Stripping of bitumen - 15 daysSurface Exceeding 10 sq m(ix) Damage to pavement edges - 15 daysexceeding 10 cm(x) Removal of debris - 6 hours(b) Hard/earth shoulders, side slopes, drains and culverts(i) Variation by more than 2% in - 30 daysprescribed slope of camber/cross fall(ii) Edge drop at shoulders exceeding - 7 days40 mm(iii) Variation by more than 15% - 30 daysin the prescribed side (embankment)slopes(iv) Rain cuts/gullies in slope - 7 days(v) Damage to or silting of culverts and - 7 daysSide drains during and immediatelyPreceding the rainy season(vi) Desilting of drains in - 48 hoursurban/semi-urban areas(c) <strong>Road</strong> side furniture including <strong>road</strong> signs and pavement marking_______________________________________________________________________MPRDC-Bhopal December, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!