12.07.2015 Views

sarangpur-shujalpur road - Madhya Pradesh Road Development ...

sarangpur-shujalpur road - Madhya Pradesh Road Development ...

sarangpur-shujalpur road - Madhya Pradesh Road Development ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sarangpur-Sujalpur <strong>Road</strong>Sr. Existing Chainage Design No. of Span Width (m)No(km)Chainage Spans (m) CW Overall3 29+080 29+080 5.0 1.95 5.55 5.554 32+790 32+790 3.0 4.60 5.80 6.805 35+050 35+050 6.0 5.20 5.75 6.756 36+030 36+030 2.0 4.80 5.75 6.752.8 Existing Bus Bays and Truck Lay-byesThe total number of bus bays and truck lay-byes on the Project Highway is noted below:a) Total number of Bus-Bays : Nilb) Total number of Truck lay-byes : Nil3.0 DisclaimerThe data presented in this schedule is for an initial understanding and guidance of theConcessionaire. The data is based on Feasibility Report prepared by the designConsultants during 2010-2011. MPRDC will not be responsible for any inaccuracy in theinformation provided and shall not be liable for or be bound by the data used by theConcessionaire in evaluating the project viability. The Concessionaire will carry out his ownindependent surveys for assessing actual position of the project corridor.The Concessionaire acknowledges that prior to the execution of this Agreement, theConcessionaire has satisfied himself (based on his own Independent assessment) of thesurvey data, specifications and standards, site and all information provided by the MPRDC.The Concessionaire acknowledges and accepts the difficulties, risks and hazards likely toarise during the course of performance of his obligations hereunder.Annexure A-1: Existing and Projected ChainagesExisting Km StoneProposed ChainageFrom (Km) To (Km) From (Km) To (Km)0.000 1.000 0.00 1.0001.000 2.000 1.000 2.0002.000 3.000 2.000 3.0003.000 4.000 3.000 4.0004.000 5.000 4.000 5.0005.000 6.000 5.000 6.0006.000 7.000 6.000 7.0007.000 8.000 7.000 8.0008.000 9.000 8.000 9.0009.000 10.00 9.000 10.0010.00 11.00 10.00 11.0011.00 12.00 11.00 12.0012.00 13.00 12.00 13.00_______________________________________________________________________MPRDC-Bhopal December, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!