12.07.2015 Views

3000305 - Dolomite Microfluidics

3000305 - Dolomite Microfluidics

3000305 - Dolomite Microfluidics

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The <strong>Dolomite</strong> Centre Ltd.Assembly instructions for separate through-cut gasket layers1 Take the chip interface base for through-cutgaskets (the height of this holder is 9.5mm).2 Insert the glass base chip as shown (anyelectrodes face up).Chip base3 Lay the through-cut gasket layer onto a cleansurface4 Place the chip top layer over the gasket, aligningthe holes in the chip with the holes in the gasket.Any etched features should be face down.5 Place the chip top and through-cut gasket over thebase chip. The gasket layer should be face down.Chip topandgasketResealable_Chip_Interface_user_instructions Page 4 of 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!