3000305 - Dolomite Microfluidics
3000305 - Dolomite Microfluidics
3000305 - Dolomite Microfluidics
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
The <strong>Dolomite</strong> Centre Ltd.Assembly instructions for separate through-cut gasket layers1 Take the chip interface base for through-cutgaskets (the height of this holder is 9.5mm).2 Insert the glass base chip as shown (anyelectrodes face up).Chip base3 Lay the through-cut gasket layer onto a cleansurface4 Place the chip top layer over the gasket, aligningthe holes in the chip with the holes in the gasket.Any etched features should be face down.5 Place the chip top and through-cut gasket over thebase chip. The gasket layer should be face down.Chip topandgasketResealable_Chip_Interface_user_instructions Page 4 of 7
The <strong>Dolomite</strong> Centre Ltd.Signed by: .......................................................................Resealable_Chip_Interface_user_instructions Page 7 of 7