12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Risk Level 2 Requirements from Attachment D <strong>of</strong> <strong>the</strong> General PermitCover and berm loose stockpiled construction materials that are not actively beingused.Store chemicals in watertight containers (with appropriate secondary containment toprevent any spillage or leakage) or in a storage shed (completely enclosed).Minimize exposure <strong>of</strong> construction materials to precipitation. This does not includematerials and equipment that are designed to be outdoors and exposed toenvironmental conditions.Prevent <strong>the</strong> <strong>of</strong>f-site tracking <strong>of</strong> loose construction and landscape materials.Prevent disposal <strong>of</strong> any rinse or wash waters or materials on impervious or pervioussite surfaces or into <strong>the</strong> storm drain system.Ensure containment <strong>of</strong> sanitation facilities to prevent discharges <strong>of</strong> pollutants to <strong>the</strong>storm water drainage system or receiving water.Clean or replace sanitation facilities and inspect <strong>the</strong>m regularly for leaks and spills.Cover waste disposal containers at <strong>the</strong> end <strong>of</strong> every business day and during a rainevent.Prevent discharges from waste disposal containers to <strong>the</strong> storm water drainage systemor receiving water.Contain and securely protect stockpiled waste material from wind and rain at all timesunless actively being used.Implement procedures that effectively address hazardous and non-hazardous spills.Equipment and materials for cleanup <strong>of</strong> spills shall be made available on-site. Spillsand leaks shall be cleaned up immediately and clean-up materials disposed <strong>of</strong>properly. Spill response personnel shall be assigned and trained.Ensure <strong>the</strong> containment <strong>of</strong> concrete washout areas and o<strong>the</strong>r washout areas that maycontain additional pollutants so <strong>the</strong>re is no discharge into <strong>the</strong> underlying soil and onto<strong>the</strong> surrounding areas.Prevent oil, grease, or fuel from leaking onto <strong>the</strong> ground, or into storm drains or surfacewaters.2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!