12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

This <strong>SWPPP</strong> (including all inspections, amendments and reports) and <strong>the</strong> General Permit shall be maintainedfor three years from <strong>the</strong> date submitted. These records shall be available at <strong>the</strong> construction site untilconstruction is complete. When <strong>the</strong> original <strong>SWPPP</strong> is retained by a crewmember in a construction vehicleand it is not currently at <strong>the</strong> construction site, current copies <strong>of</strong> <strong>the</strong> BMPs and map/drawing will be left with <strong>the</strong>field crew and <strong>the</strong> original <strong>SWPPP</strong> shall be made available via a request by radio/telephone.)1.3 Legally Responsible PartyLegally Responsible Party: Michael A. Siminski, Mayor, <strong>City</strong> <strong>of</strong> <strong>Lompoc</strong>The Legally Responsible Party (LRP) is responsible for obtaining permit coverage prior to <strong>the</strong> commencement<strong>of</strong> construction activity. The Legally Responsible Person (LRP) or LRP’s Approved Signatory, a person legallyauthorized to sign and certify Permit Registration Documents (PRDs) and Notice <strong>of</strong> Termination (NOT) onbehalf <strong>of</strong> <strong>the</strong> LRP, must submit all information electronically via <strong>the</strong> SWRCB’s SMARTS. In addition, all AnnualReports, or o<strong>the</strong>r information required by <strong>the</strong> General Permit or requested by <strong>the</strong> Regional <strong>Water</strong> Board, State<strong>Water</strong> Board, or U.S. EPA shall be certified and submitted by <strong>the</strong> LRP. A copy <strong>of</strong> <strong>the</strong> written agreement oro<strong>the</strong>r mechanism that provides this authority from <strong>the</strong> LRP is provided in Appendix A <strong>of</strong> <strong>the</strong> <strong>SWPPP</strong>.The LRP makes <strong>the</strong> following certification when signing any PRDs:"I certify under penalty <strong>of</strong> law that this document and all attachments were prepared under mydirection or supervision in accordance with a system designed to assure that qualified personnelproperly ga<strong>the</strong>r and evaluate <strong>the</strong> information submitted. Based on my inquiry <strong>of</strong> <strong>the</strong> person orpersons who manage <strong>the</strong> system or those persons directly responsible for ga<strong>the</strong>ring <strong>the</strong>information, to <strong>the</strong> best <strong>of</strong> my knowledge and belief, <strong>the</strong> information submitted is, true, accurate,and complete. I am aware that <strong>the</strong>re are significant penalties for submitting false information,including <strong>the</strong> possibility <strong>of</strong> fine and imprisonment for knowing violations."Appendix A contains a list <strong>of</strong> authorized representatives, <strong>the</strong>ir role on <strong>the</strong> project, contact information andverification <strong>of</strong> appropriate training and a copy <strong>of</strong> a signed certification statement.1.4 Contractor InformationAppendix B includes <strong>the</strong> names and contact information <strong>of</strong> <strong>the</strong> <strong>Storm</strong> <strong>Water</strong> <strong>Pollution</strong> <strong>Prevention</strong> <strong>Plan</strong>Manager (<strong>SWPPP</strong>M) and a list <strong>of</strong> names <strong>of</strong> all contractors, subcontractors, and individuals who will be directedby <strong>the</strong> <strong>SWPPP</strong>M. This list shall include telephone numbers and work addresses. Specific areas <strong>of</strong>responsibility <strong>of</strong> each subcontractor and emergency contact numbers shall also be included.The discharger shall ensure that all BMPs required by this General Permit are implemented by a Qualified<strong>SWPPP</strong>M. The <strong>SWPPP</strong>M shall be a person responsible for non-storm water and storm water visualobservations, sampling and analysis and shall have primary responsibility and significant authority for <strong>the</strong>implementation, maintenance, inspection <strong>of</strong> <strong>the</strong> site to ensure full compliance with <strong>the</strong> <strong>SWPPP</strong> and <strong>the</strong> Permit.1.5 <strong>SWPPP</strong> AvailabilityThe <strong>SWPPP</strong> shall be available at <strong>the</strong> construction site during working hours while construction is occurringand shall be made available upon request by a State or Municipal inspector. When <strong>the</strong> original <strong>SWPPP</strong> isretained by a crewmember in a construction vehicle and is not currently at <strong>the</strong> construction site, copies <strong>of</strong> <strong>the</strong>BMPs and map/drawing will be left with <strong>the</strong> field crew and <strong>the</strong> original <strong>SWPPP</strong> shall be made available via arequest by radio/telephone.1.6 <strong>Storm</strong> <strong>Water</strong> Multi-Application and Report Tracking SystemThis General Permit requires all dischargers to electronically file all Permit Registration Documents (PRDs),Notices <strong>of</strong> Termination (NOT), changes <strong>of</strong> information, annual reporting, and o<strong>the</strong>r compliance documentsrequired by this General Permit through <strong>the</strong> State <strong>Water</strong> Board’s <strong>Storm</strong> water Multi-Application and ReportTracking System (SMARTS) website.Municipal <strong>Water</strong> Well No. 11 and Transmission <strong>Water</strong> Main – <strong>SWPPP</strong> July 20, 2010Page 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!