Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc! Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

www1.cityoflompoc.com
from www1.cityoflompoc.com More from this publisher
12.07.2015 Views

ATTACHMENT A.1LUP Project Area or Project Section Area Type DeterminationATTACHMENT A.1Will≥ 70% of theconstructionactivity occuron pavedsurfaces**?YesWill areasdisturbedbe returned to preconstructionconditionsor equivalentcondition* at the endof the day?YesNoNoWill theconstructionactivity occur onunpaved improvedroads, including theirshoulders or landimmediatelyadjacentto them?NoWill > 30%of the constructionactivity occur within thenon-paved shoulders orland immediatelyadjacent to pavedsurfaces?YesNoThis is aProjectType 1 LUPYesWill areasdisturbed bereturned to preconstructionconditionsor equivalentcondition* at the endof the day?NoEYesNoNoWill areas ofestablished vegetationdisturbed by theconstruction be stabilizedand revegetated by theend of the project?YesWhenrequired, willadequate temporarystabilization BMPs beinstalled and maintained untilvegetation is established tomeet the Permit’s minimumcover requirements forfinal stabilization?Yes*See Definition of Terms** Or: “Will < 30% of the soil disturbance occur on unpaved surfaces?2009-0009-DWQ 1September 2, 2009

ATTACHMENT A.1EATTACHMENT A.1LUP Project Area or Project Section AreaType DeterminationIs theproject area orproject section arealocated within aSediment SensitiveWatershed*?YesIs theproject area or sectionlocated within the floodplain or flood prone area(riparian zone) of aSensitive ReceivingWater Body*?NoNoReceivingWater Risk:“HIGH”YesReceivingWater Risk:“MEDIUM”ReceivingWater Risk:“LOW”Calculate the Sediment Risk Based on the Attachment C Risk Factor WorksheetProject Sediment Risk =“LOW”:

ATTACHMENT A.1LUP Project Area or Project Section Area Type DeterminationATTACHMENT A.1Will≥ 70% <strong>of</strong> <strong>the</strong>constructionactivity occuron pavedsurfaces**?YesWill areasdisturbedbe returned to preconstructionconditionsor equivalentcondition* at <strong>the</strong> end<strong>of</strong> <strong>the</strong> day?YesNoNoWill <strong>the</strong>constructionactivity occur onunpaved improvedroads, including <strong>the</strong>irshoulders or landimmediatelyadjacentto <strong>the</strong>m?NoWill > 30%<strong>of</strong> <strong>the</strong> constructionactivity occur within <strong>the</strong>non-paved shoulders orland immediatelyadjacent to pavedsurfaces?YesNoThis is aProjectType 1 LUPYesWill areasdisturbed bereturned to preconstructionconditionsor equivalentcondition* at <strong>the</strong> end<strong>of</strong> <strong>the</strong> day?NoEYesNoNoWill areas <strong>of</strong>established vegetationdisturbed by <strong>the</strong>construction be stabilizedand revegetated by <strong>the</strong>end <strong>of</strong> <strong>the</strong> project?YesWhenrequired, willadequate temporarystabilization BMPs beinstalled and maintained untilvegetation is established tomeet <strong>the</strong> Permit’s minimumcover requirements forfinal stabilization?Yes*See Definition <strong>of</strong> Terms** Or: “Will < 30% <strong>of</strong> <strong>the</strong> soil disturbance occur on unpaved surfaces?2009-0009-DWQ 1September 2, 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!