ATTACHMENT A.1LUP Project Area or Project Section Area Type DeterminationATTACHMENT A.1Will≥ 70% of theconstructionactivity occuron pavedsurfaces**?YesWill areasdisturbedbe returned to preconstructionconditionsor equivalentcondition* at the endof the day?YesNoNoWill theconstructionactivity occur onunpaved improvedroads, including theirshoulders or landimmediatelyadjacentto them?NoWill > 30%of the constructionactivity occur within thenon-paved shoulders orland immediatelyadjacent to pavedsurfaces?YesNoThis is aProjectType 1 LUPYesWill areasdisturbed bereturned to preconstructionconditionsor equivalentcondition* at the endof the day?NoEYesNoNoWill areas ofestablished vegetationdisturbed by theconstruction be stabilizedand revegetated by theend of the project?YesWhenrequired, willadequate temporarystabilization BMPs beinstalled and maintained untilvegetation is established tomeet the Permit’s minimumcover requirements forfinal stabilization?Yes*See Definition of Terms** Or: “Will < 30% of the soil disturbance occur on unpaved surfaces?2009-0009-DWQ 1September 2, 2009
ATTACHMENT A.1EATTACHMENT A.1LUP Project Area or Project Section AreaType DeterminationIs theproject area orproject section arealocated within aSediment SensitiveWatershed*?YesIs theproject area or sectionlocated within the floodplain or flood prone area(riparian zone) of aSensitive ReceivingWater Body*?NoNoReceivingWater Risk:“HIGH”YesReceivingWater Risk:“MEDIUM”ReceivingWater Risk:“LOW”Calculate the Sediment Risk Based on the Attachment C Risk Factor WorksheetProject Sediment Risk =“LOW”:
- Page 1 and 2: Storm Water Pollution Prevention Pl
- Page 3 and 4: Section 1 Introduction1.1 Obtaining
- Page 5 and 6: 1.7 Required Non-Compliance Reporti
- Page 7 and 8: proposed drainage swale. Run-on als
- Page 9 and 10: • Paint (for pavement markings)2.
- Page 11 and 12: SE-10 Storm Drain Inlet ProtectionT
- Page 13 and 14: Section 4 Construction Site Monitor
- Page 15 and 16: Section 34.1 Visual Monitoring/ Ins
- Page 17 and 18: Sampling personnel will collect sto
- Page 19 and 20: • Discard sample bottles or sampl
- Page 21 and 22: • A summary of all analytical res
- Page 23 and 24: Section 6 Notice of TerminationWith
- Page 25 and 26: Owner’s (or Authorized Representa
- Page 27 and 28: Appendix BContractor Information
- Page 29 and 30: Appendix CSite Map/Erosion and Sedi
- Page 31 and 32: SILT FENCEINLET PROTECTIONAScale: N
- Page 33 and 34: Risk Assessment DeterminationConstr
- Page 35 and 36: 12Sediment Risk Factor WorksheetA)
- Page 37: Combined Risk Level MatrixReceiving
- Page 41 and 42: Risk Level 2 Requirements from Atta
- Page 43: Any sediment basins shall be design
ATTACHMENT A.1LUP Project Area or Project Section Area Type DeterminationATTACHMENT A.1Will≥ 70% <strong>of</strong> <strong>the</strong>constructionactivity occuron pavedsurfaces**?YesWill areasdisturbedbe returned to preconstructionconditionsor equivalentcondition* at <strong>the</strong> end<strong>of</strong> <strong>the</strong> day?YesNoNoWill <strong>the</strong>constructionactivity occur onunpaved improvedroads, including <strong>the</strong>irshoulders or landimmediatelyadjacentto <strong>the</strong>m?NoWill > 30%<strong>of</strong> <strong>the</strong> constructionactivity occur within <strong>the</strong>non-paved shoulders orland immediatelyadjacent to pavedsurfaces?YesNoThis is aProjectType 1 LUPYesWill areasdisturbed bereturned to preconstructionconditionsor equivalentcondition* at <strong>the</strong> end<strong>of</strong> <strong>the</strong> day?NoEYesNoNoWill areas <strong>of</strong>established vegetationdisturbed by <strong>the</strong>construction be stabilizedand revegetated by <strong>the</strong>end <strong>of</strong> <strong>the</strong> project?YesWhenrequired, willadequate temporarystabilization BMPs beinstalled and maintained untilvegetation is established tomeet <strong>the</strong> Permit’s minimumcover requirements forfinal stabilization?Yes*See Definition <strong>of</strong> Terms** Or: “Will < 30% <strong>of</strong> <strong>the</strong> soil disturbance occur on unpaved surfaces?2009-0009-DWQ 1September 2, 2009