Order2. For Risk Level 2 and 3 dischargers, <strong>the</strong> NAL storm event daily averagefor turbidity is 250 NTU. The discharger shall take actions asdescribed below if <strong>the</strong> discharge is outside <strong>of</strong> this range <strong>of</strong> turbidityvalues.3. Whenever <strong>the</strong> results from a storm event daily average indicate that<strong>the</strong> discharge is below <strong>the</strong> lower NAL for pH, exceeds <strong>the</strong> upper NALfor pH, or exceeds <strong>the</strong> turbidity NAL (as listed in Table 1), <strong>the</strong>discharger shall conduct a construction site and run-on evaluation todetermine whe<strong>the</strong>r pollutant source(s) associated with <strong>the</strong> site’sconstruction activity may have caused or contributed to <strong>the</strong> NALexceedance and shall immediately implement corrective actions if <strong>the</strong>yare needed.4. The site evaluation shall be documented in <strong>the</strong> <strong>SWPPP</strong> andspecifically address whe<strong>the</strong>r <strong>the</strong> source(s) <strong>of</strong> <strong>the</strong> pollutants causing <strong>the</strong>exceedance <strong>of</strong> <strong>the</strong> NAL:a. Are related to <strong>the</strong> construction activities and whe<strong>the</strong>r additionalBMPs are required to (1) meet BAT/BCT requirements; (2) reduceor prevent pollutants in storm water discharges from causingexceedances <strong>of</strong> receiving water objectives; and (3) determine whatcorrective action(s) were taken or will be taken and with adescription <strong>of</strong> <strong>the</strong> schedule for completion.AND/OR:b. Are related to <strong>the</strong> run-on associated with <strong>the</strong> construction sitelocation and whe<strong>the</strong>r additional BMPs measures are required to (1)meet BAT/BCT requirements; (2) reduce or prevent pollutants instorm water discharges from causing exceedances <strong>of</strong> receivingwater objectives; and (3) what corrective action(s) were taken orwill be taken with a description <strong>of</strong> <strong>the</strong> schedule for completion.2009-0009-DWQ 31 September 02, 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!