12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OrderE. Proper Operation and MaintenanceThe discharger shall at all times properly operate and maintain anyfacilities and systems <strong>of</strong> treatment and control (and relatedappurtenances) which are installed or used by <strong>the</strong> discharger to achievecompliance with <strong>the</strong> conditions <strong>of</strong> this General Permit. Proper operationand maintenance also includes adequate laboratory controls andappropriate quality assurance procedures. Proper operation andmaintenance may require <strong>the</strong> operation <strong>of</strong> backup or auxiliary facilities orsimilar systems installed by a discharger when necessary to achievecompliance with <strong>the</strong> conditions <strong>of</strong> this General Permit.F. Property RightsThis General Permit does not convey any property rights <strong>of</strong> any sort orany exclusive privileges, nor does it authorize any injury to privateproperty or any invasion <strong>of</strong> personal rights, nor does it authorize anyinfringement <strong>of</strong> Federal, State, or local laws or regulations.G. Duty to Maintain Records and Provide Information1. The discharger shall maintain a paper or electronic copy <strong>of</strong> all requiredrecords, including a copy <strong>of</strong> this General Permit, for three years from<strong>the</strong> date generated or date submitted, whichever is last. Theserecords shall be available at <strong>the</strong> construction site until construction iscompleted.2. The discharger shall furnish <strong>the</strong> Regional <strong>Water</strong> Board, State <strong>Water</strong>Board, or U.S. EPA, within a reasonable time, any requestedinformation to determine compliance with this General Permit. Thedischarger shall also furnish, upon request, copies <strong>of</strong> records that arerequired to be kept by this General Permit.H. Inspection and EntryThe discharger shall allow <strong>the</strong> Regional <strong>Water</strong> Board, State <strong>Water</strong> Board,U.S. EPA, and/or, in <strong>the</strong> case <strong>of</strong> construction sites which dischargethrough a municipal separate storm sewer, an authorized representative <strong>of</strong><strong>the</strong> municipal operator <strong>of</strong> <strong>the</strong> separate storm sewer system receiving <strong>the</strong>discharge, upon <strong>the</strong> presentation <strong>of</strong> credentials and o<strong>the</strong>r documents asmay be required by law, to:1. Enter upon <strong>the</strong> discharger’s premises at reasonable times where aregulated construction activity is being conducted or where recordsmust be kept under <strong>the</strong> conditions <strong>of</strong> this General Permit;2009-0009-DWQ 23 September 02, 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!