12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Orderg. All construction-related equipment, materials and any temporaryBMPs no longer needed are removed from <strong>the</strong> site.2. The discharger shall certify that final stabilization conditions aresatisfied in <strong>the</strong>ir NOT. Failure to certify shall result in continuation <strong>of</strong>permit coverage and annual billing.3. The NOT must demonstrate through photos, RUSLE or RUSLE2, orresults <strong>of</strong> testing and analysis that <strong>the</strong> site meets all <strong>of</strong> <strong>the</strong> conditionsabove (Section II.D.1) and <strong>the</strong> final stabilization condition (SectionII.D.1.a) is attained by one <strong>of</strong> <strong>the</strong> following methods:a. “70% final cover method,” no computational pro<strong>of</strong> requiredOR:b. “RUSLE or RUSLE2 method,” computational pro<strong>of</strong> requiredOR:c. “Custom method”, <strong>the</strong> discharger shall demonstrate in some o<strong>the</strong>rmanner than a or b, above, that <strong>the</strong> site complies with <strong>the</strong> “finalstabilization” requirement in Section II.D.1.a.2009-0009-DWQ 19 September 02, 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!