Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!
Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc! Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!
OrderIT IS HEREBY ORDERED that all dischargers subject to this General Permitshall comply with the following conditions and requirements (including allconditions and requirements as set forth in Attachments A, B, C, D, E and F) 6 :II. CONDITIONS FOR PERMIT COVERAGEA. Linear Underground/Overhead Projects (LUPs)1. Linear Underground/Overhead Projects (LUPs) include, but are notlimited to, any conveyance, pipe, or pipeline for the transportation ofany gaseous, liquid (including water and wastewater for domesticmunicipal services), liquescent, or slurry substance; any cable line orwire for the transmission of electrical energy; any cable line or wire forcommunications (e.g. telephone, telegraph, radio or televisionmessages); and associated ancillary facilities. Construction activitiesassociated with LUPs include, but are not limited to, (a) those activitiesnecessary for the installation of underground and overhead linearfacilities (e.g., conduits, substructures, pipelines, towers, poles, cables,wires, connectors, switching, regulating and transforming equipment,and associated ancillary facilities); and include, but are not limited to,(b) underground utility mark-out, potholing, concrete and asphaltcutting and removal, trenching, excavation, boring and drilling, accessroad and pole/tower pad and cable/wire pull station, substationconstruction, substructure installation, construction of tower footingsand/or foundations, pole and tower installations, pipeline installations,welding, concrete and/ or pavement repair or replacement, andstockpile/borrow locations.2. The utility company, municipality, or other public or private company oragency that owns or operates the linear underground/overhead projectis responsible for obtaining coverage under the General Permit wherethe construction of pipelines, utility lines, fiber-optic cables, or otherlinear underground/overhead projects will occur across severalproperties unless the LUP construction activities are covered underanother construction storm water permit.3. Only LUPs shall comply with the conditions and requirements inAttachment A, A.1 & A.2 of this Order. The balance of this Order is notapplicable to LUPs except as indicated in Attachment A.B. Obtaining Permit Coverage Traditional Construction Sites6 These attachments are part of the General Permit itself and are not separate documents that are capableof being updated independently by the State Water Board.2009-0009-DWQ 14 September 02, 2009
Order1. The Legally Responsible Person (LRP) (see Special Provisions,Electronic Signature and Certification Requirements, Section IV.I.1)must obtain coverage under this General Permit.2. To obtain coverage, the LRP must electronically file PermitRegistration Documents (PRDs) prior to the commencement ofconstruction activity. Failure to obtain coverage under this GeneralPermit for storm water discharges to waters of the United States is aviolation of the CWA and the California Water Code.3. PRDs shall consist of:a. Notice of Intent (NOI)b. Risk Assessment (Section VIII)c. Site Mapd. Storm Water Pollution Prevention Plan (Section XIV)e. Annual Feef. Signed Certification StatementAny information provided to the Regional Water Board shall complywith the Homeland Security Act and any other federal law thatconcerns security in the United States; any information that does notcomply should not be submitted.Attachment B contains additional PRD information. Dischargers mustelectronically file the PRDs, and mail the appropriate annual fee to theState Water Board.4. This permit is effective on July 1, 2010.a. Dischargers Obtaining Coverage On or After July 1, 2010: Alldischargers requiring coverage on or after July 1, 2010, shallelectronically file their PRDs prior to the commencement ofconstruction activities, and mail the appropriate annual fee no laterthan seven days prior to the commencement of constructionactivities. Permit coverage shall not commence until the PRDs andthe annual fee are received by the State Water Board, and a WDIDnumber is assigned and sent by SMARTS.b. Dischargers Covered Under 99-08-DWQ and 2003-0007-DWQ:Existing dischargers subject to State Water Board Order No. 99-08-DWQ (existing dischargers) will continue coverage under 99-08-DWQ until July 1, 2010. After July 1, 2010, all NOIs subject toState Water Board Order No. 99-08-DWQ will be terminated.Existing dischargers shall electronically file their PRDs no later than2009-0009-DWQ 15 September 02, 2009
- Page 182 and 183: Construction Site Monitoring PlanDa
- Page 184 and 185: Maintenance, Inspection, and Repair
- Page 186 and 187: Maintenance, Inspection and Repair
- Page 188 and 189: Maintenance, Inspection and Repair
- Page 190 and 191: Maintenance, Inspection and Repair
- Page 192 and 193: Maintenance, Inspection and Repair
- Page 194 and 195: Maintenance, Inspection and Repair
- Page 196 and 197: Quality Assurance and Quality Contr
- Page 198 and 199: Date:Date Rain Predicted to Occur:0
- Page 200 and 201: Rain Event Action Plan (REAP)Date o
- Page 202 and 203: Appendix HPollutant Testing Guidanc
- Page 204 and 205: Appendix HIPollutant Testing Guidan
- Page 206 and 207: Appendix HIPollutant Testing Guidan
- Page 208 and 209: Appendix HIPollutant Testing Guidan
- Page 210 and 211: Appendix JOther Plans and Permits
- Page 212 and 213: TABLE OF CONTENTSI. FINDINGS ......
- Page 214 and 215: Order3. This General Permit regulat
- Page 216 and 217: OrderB. Activities Covered Under th
- Page 218 and 219: Order35. Discharges occurring in ba
- Page 220 and 221: OrderG. Determining and Reducing Ri
- Page 222 and 223: Order55. This General Permit establ
- Page 224 and 225: Ordercause physical impacts on rece
- Page 228 and 229: OrderJuly 1, 2010. If an existing d
- Page 230 and 231: Order3. The discharger shall contin
- Page 232 and 233: OrderIII. DISCHARGE PROHIBITIONSA.
- Page 234 and 235: OrderIV. SPECIAL PROVISIONSA. Duty
- Page 236 and 237: Order2. Access and copy at reasonab
- Page 238 and 239: Order2. There were no feasible alte
- Page 240 and 241: Order2. The Porter-Cologne Water Qu
- Page 242 and 243: Ordershall be within the ranges spe
- Page 244 and 245: OrderVI. RECEIVING WATER LIMITATION
- Page 246 and 247: OrderEffective two years after the
- Page 248 and 249: OrderXIII. POST-CONSTRUCTION STANDA
- Page 250 and 251: OrderXIV. SWPPP REQUIREMENTSA. The
- Page 252 and 253: OrderXVI. ANNUAL REPORTING REQUIREM
Order1. The Legally Responsible Person (LRP) (see Special Provisions,Electronic Signature and Certification Requirements, Section IV.I.1)must obtain coverage under this General Permit.2. To obtain coverage, <strong>the</strong> LRP must electronically file PermitRegistration Documents (PRDs) prior to <strong>the</strong> commencement <strong>of</strong>construction activity. Failure to obtain coverage under this GeneralPermit for storm water discharges to waters <strong>of</strong> <strong>the</strong> United States is aviolation <strong>of</strong> <strong>the</strong> CWA and <strong>the</strong> California <strong>Water</strong> Code.3. PRDs shall consist <strong>of</strong>:a. Notice <strong>of</strong> Intent (NOI)b. Risk Assessment (Section VIII)c. Site Mapd. <strong>Storm</strong> <strong>Water</strong> <strong>Pollution</strong> <strong>Prevention</strong> <strong>Plan</strong> (Section XIV)e. Annual Feef. Signed Certification StatementAny information provided to <strong>the</strong> Regional <strong>Water</strong> Board shall complywith <strong>the</strong> Homeland Security Act and any o<strong>the</strong>r federal law thatconcerns security in <strong>the</strong> United States; any information that does notcomply should not be submitted.Attachment B contains additional PRD information. Dischargers mustelectronically file <strong>the</strong> PRDs, and mail <strong>the</strong> appropriate annual fee to <strong>the</strong>State <strong>Water</strong> Board.4. This permit is effective on July 1, 2010.a. Dischargers Obtaining Coverage On or After July 1, 2010: Alldischargers requiring coverage on or after July 1, 2010, shallelectronically file <strong>the</strong>ir PRDs prior to <strong>the</strong> commencement <strong>of</strong>construction activities, and mail <strong>the</strong> appropriate annual fee no laterthan seven days prior to <strong>the</strong> commencement <strong>of</strong> constructionactivities. Permit coverage shall not commence until <strong>the</strong> PRDs and<strong>the</strong> annual fee are received by <strong>the</strong> State <strong>Water</strong> Board, and a WDIDnumber is assigned and sent by SMARTS.b. Dischargers Covered Under 99-08-DWQ and 2003-0007-DWQ:Existing dischargers subject to State <strong>Water</strong> Board Order No. 99-08-DWQ (existing dischargers) will continue coverage under 99-08-DWQ until July 1, 2010. After July 1, 2010, all NOIs subject toState <strong>Water</strong> Board Order No. 99-08-DWQ will be terminated.Existing dischargers shall electronically file <strong>the</strong>ir PRDs no later than2009-0009-DWQ 15 September 02, 2009