12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 5 Annual Reporting RequirementsThe General Permit requires all projects that are enrolled for more than one continuous three-month period tosubmit information and annually certify that <strong>the</strong>ir site is in compliance with <strong>the</strong> General Permit requirements.The primary purpose <strong>of</strong> this requirement is to provide information needed for overall program evaluation andpubic information.All dischargers shall prepare and electronically submit an Annual Report no later than September 1 <strong>of</strong> eachyear.The discharger shall retain an electronic or paper copy <strong>of</strong> each Annual Report for a minimum <strong>of</strong> three yearsafter <strong>the</strong> date <strong>the</strong> annual report is filed.5.1 <strong>Storm</strong> <strong>Water</strong> MonitoringThe discharger shall include storm water monitoring information in <strong>the</strong> Annual Report:1. A summary and evaluation <strong>of</strong> all sampling and analysis results, including copies <strong>of</strong> laboratory reports;2. The analytical method(s), method reporting unit(s), and method detection limit(s) <strong>of</strong> each analyticalparameter (analytical results that are less than <strong>the</strong> method detection limit shall be reported as "lessthan <strong>the</strong> method detection limit");3. A summary <strong>of</strong> all corrective actions taken during <strong>the</strong> compliance year;4. Identification <strong>of</strong> any compliance activities or corrective actions that were not implemented;5. A summary <strong>of</strong> all violations <strong>of</strong> <strong>the</strong> General Permit;6. The names <strong>of</strong> individual(s) who performed <strong>the</strong> facility inspections, sampling, visual observation(inspections), and/or measurements;7. The date, place, time <strong>of</strong> facility inspections, sampling, visual observation (inspections), and/ormeasurements, including precipitation (rain gauge); and8. The visual observation and sample collection exception records and reports specified in this <strong>SWPPP</strong>.5.2 Training InformationThe discharger shall include documentation <strong>of</strong> all training for individuals responsible for:1. All activities associated with compliance with <strong>the</strong> General Permit.2. BMP installation, inspection, maintenance, and repair; and3. Overseeing, revising, and amending <strong>the</strong> <strong>SWPPP</strong>Municipal <strong>Water</strong> Well No. 11 and Transmission <strong>Water</strong> Main – <strong>SWPPP</strong> July 20, 2010Page 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!