12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

In <strong>the</strong> event that sampling is needed, all non-storm water sample analyses will be sent to a state certifiedlaboratory. Use Appendix H as a guide.Sample Documentation ProceduresAll original data documented on sample bottle identification labels, Chain <strong>of</strong> Custody forms, Sampling ActivityLogs, and Inspection Checklists will be recorded using waterpro<strong>of</strong> ink. These will be considered accountabledocuments. If an error is made on an accountable document, <strong>the</strong> individual will make corrections by liningthrough <strong>the</strong> error and entering <strong>the</strong> correct information. The erroneous information will not be obliterated. Allcorrections will be initialed and dated. Copies <strong>of</strong> <strong>the</strong> Construction Site Monitoring Checklists are provided inAppendix F.Sampling and field analysis activities will be documented using <strong>the</strong> following:• Sample Bottle Identification Labels: Sampling personnel will attach an identification label to eachsample bottle. At a minimum, <strong>the</strong> following information will be recorded on <strong>the</strong> label, as appropriate:– Project name– Project number– Unique sample identification number and location.[Project Number]-[Six digit sample collection date]-[Location](Example: 0G5304-081801-Upstream).Quality assurance/quality control (QA/QC) samples shall be identifiedsimilarly using a unique sample number or designation(Example: 0G5304-081801-DUP1).– Collection date/time (No time applied to QA/QC samples)– Analysis constituent• Sampling Activity Logs: A log <strong>of</strong> sampling events will identify:– Sampling date– Separate times for sample collection <strong>of</strong> upstream, downstream, run-on, and QA/QC samplesrecorded to <strong>the</strong> nearest minute– Unique sample identification number and location– Analysis constituent– Names <strong>of</strong> sampling personnel– Wea<strong>the</strong>r conditions (including precipitation amount)– Field analysis results– O<strong>the</strong>r pertinent data• Chain <strong>of</strong> Custody (COC) forms: All samples to be analyzed by a state certified laboratory will beaccompanied by a COC form provided by <strong>the</strong> laboratory. Only <strong>the</strong> sample collectors will sign <strong>the</strong> COCform over to <strong>the</strong> lab. COC procedures will be strictly adhered to for QA/QC purposes.• <strong>Storm</strong> <strong>Water</strong> Quality Construction Inspection Checklists: When applicable, <strong>the</strong>Contractor’s storm water inspector will document on <strong>the</strong> checklist that samples forsedimentation/siltation and/or turbidity were taken during a rain event.Ensure that all laboratory analyses are conducted according to test procedures under 40 CFR Part 136, unlesso<strong>the</strong>r test procedures have been specified and approved.4.6 Reporting Requirements and Records RetentionRecords <strong>of</strong> all monitoring inspections are required to remain onsite during <strong>the</strong> construction period and for aminimum <strong>of</strong> three years. All field and lab analyses results shall be kept in <strong>the</strong> <strong>SWPPP</strong> document.Records shall include <strong>the</strong> following items:• The date, place, and time <strong>of</strong> facility inspections, sampling, visual observations (inspections), and/ormeasurements, including precipitation;• The individual(s) who performed <strong>the</strong> facility inspections, sampling, visual observation (inspections),and/or measurements;• The date and approximate time <strong>of</strong> analyses;• The individual(s) who performed <strong>the</strong> analyses;Municipal <strong>Water</strong> Well No. 11 and Transmission <strong>Water</strong> Main – <strong>SWPPP</strong> July 20, 2010Page 20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!