12.07.2015 Views

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

Storm Water Pollution Prevention Plan (SWPPP) - the City of Lompoc!

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Maintenance, Inspection and Repair ProgramThe contractor shall use <strong>the</strong> following guidelines for maintenance, inspection, and repair <strong>of</strong> BMPs identified in <strong>the</strong> <strong>SWPPP</strong> incombination with <strong>the</strong> Field Log Sheets.All BMPs must be inspected in accordance with <strong>the</strong> General Permit requirements for <strong>the</strong> associated project type andrisk level 2. In <strong>the</strong> event <strong>of</strong> a BMP failure or shortcoming, design changes to <strong>the</strong> BMP must be madeto avoid a potential violation.BEST MANAGEMENT PRACTICES INSPECTION FREQUENCYMAINTENANCE/REPAIR PROGRAM(BMPs)(all controls)NS13: Concrete FinishingWM01: Material Delivery andStorageWM02: Material UseWM03: Stockpile ManagementInspect and verify that activitybased BMPs are in place prior to <strong>the</strong>commencement <strong>of</strong> associatedactivities. Inspect prior t<strong>of</strong>orecasted rain event, daily duringrain events, after rain events, andweekly.• Inspect BMPs subject to non‐storm waterdischarges daily while non‐storm waterdischarges occur.• Sample non‐storm water discharges andstorm water run<strong>of</strong>f that contacts uncuredand partially cured concrete as required.• Sweep or vacuum up debris fromsandblasting at <strong>the</strong> end <strong>of</strong> each shift.WASTE MANAGEMENT AND MATERIALS POLLUTION CONTROL BMPsPrior to forecasted rain, daily duringextended rain events, after rainevents, and weekly.Verify that activity based BMPs arein place prior to <strong>the</strong>commencement <strong>of</strong> associatedactivities. Inspect prior t<strong>of</strong>orecasted rain, daily duringextended rain events, after rainevents, and weekly.Inspect prior to forecasted rain,daily during extended rain events,after rain events, and weekly.• At <strong>the</strong> end <strong>of</strong> each work shift, remove andcontain liquid and solid waste fromcontainment structures, if any, and from <strong>the</strong>general work area.• Inspect containment structures for damageprior to use and prior to <strong>the</strong> onset <strong>of</strong>forecasted rain.• Keep storage areas clean and wellorganized, including a list <strong>of</strong> all materialson‐site.• Inspect labels on containers for legibility andaccuracy.• Repair or replace perimeter controls,containment structures, covers and liners asneeded to maintain proper function.• Ensure all employees and subcontractorthroughout <strong>the</strong> job area using appropriatepractices.• Repair and/or replace perimeter controlsand covers as needed to keep <strong>the</strong>mfunctioning properly.• Sediment shall be removed when it reacheson‐third <strong>of</strong> <strong>the</strong> barrier height.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!