Section 3 Best Management PracticesBest Management Practices (BMPs) were chosen for this project to reduce or eliminate pollutants in stormwater discharge, and to comply with <strong>the</strong> Provisions <strong>of</strong> Attachment D <strong>of</strong> <strong>the</strong> General Order (Risk Level 2Requirements) as well as those in <strong>the</strong> General Permit Order. BMPs are shown in <strong>the</strong> erosion and sedimentcontrol plan provided in Appendix C.The General Permit Order requires:Dischargers shall minimize or prevent pollutants in storm water discharges and authorized non-storm waterdischarges through <strong>the</strong> use <strong>of</strong> controls, structures, and management practices that achieve Best AvailableTechnology Economically Achievable (BAT) for toxic and non-conventional pollutants and Best ConventionalPollutant Control Technology (BCT) for conventional pollutants.<strong>Storm</strong> water discharges and authorized non-storm water discharges regulated by this General Permit shall notcontain a hazardous substance equal to or in excess <strong>of</strong> reportable quantities established in 40 C.F.R. §§ 117.3and 302.4, unless a separate NPDES Permit has been issued to regulate those discharges.As a Risk level 2 discharger this project is subject to Numeric Action Levels (NALs) for pH and turbidity asdescribed in Section 3.4.3.1 BMP Installation ScheduleThe Contractor is responsible for ensuring that appropriate BMPs are in place during <strong>the</strong> operations requiring<strong>the</strong> BMPs. Below is a schedule intended to provide <strong>the</strong> minimum BMPs necessary during each phase <strong>of</strong> <strong>the</strong>contractor’s operation. Additional BMPs may be necessary. Some BMPs installed early in <strong>the</strong> project shallremain in place upon completion <strong>of</strong> <strong>the</strong> project, while o<strong>the</strong>rs must be removed prior to <strong>the</strong> completion <strong>of</strong> <strong>the</strong>project. Appendix E provides BMP Fact Sheets on design and implementation guidelines for each BMP.The following BMPs shall be installed / utilized prior to clearing and grubbing operations:EC-1 SchedulingEC-2 Preservation <strong>of</strong> Existing VegetationSE-7 Street Sweeping and VacuumingNS-6 Illicit Connection/DischargeNS-9 Vehicle and Equipment FuelingNS-10 Vehicle & Equipment MaintenanceWM-1 Material Delivery and StorageWM-2 Material UseWM-3 Stockpile ManagementWM-4 Spill <strong>Prevention</strong> and ControlWM-5 Solid Waste ManagementWM-6 Hazardous Waste ManagementWM-9 Sanitary/Septic Waste ManagementIf materials are stockpiled on-site and <strong>the</strong> stockpiles are inactive (not scheduled to be re-disturbed for at least14 days), <strong>the</strong>n <strong>the</strong> stockpiled areas shall be covered and a berm placed around <strong>the</strong> materials in accordancewith WM-3 “Stockpile Management.”The following BMPs shall be installed / utilized during grading/mobilization operations:WE-1 Wind Erosion ControlTC-1 Stabilized Construction Entrance/ExitNS-1 <strong>Water</strong> Conservation PracticesSE-1 Silt FenceSE-5 Fiber RollsThe following BMPs shall be installed / utilized upon completion <strong>of</strong> drainage work:EC-10 Velocity Dissipation DevicesMunicipal <strong>Water</strong> Well No. 11 and Transmission <strong>Water</strong> Main – <strong>SWPPP</strong> July 20, 2010Page 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!