EoI No: TD-I (TSP)-71/12ST&SC Development Department, Block No-7, Odisha Secretariat, Bhubaneswar,Odishawww.stscodisha.<strong>gov</strong>.<strong>in</strong>e-mail: stscdev@gmail.com and cc to gajanandsag@gmail.com<str<strong>on</strong>g>M<strong>in</strong>utes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>Pre</str<strong>on</strong>g>-<str<strong>on</strong>g>Bid</str<strong>on</strong>g> <str<strong>on</strong>g>Meet<strong>in</strong>g</str<strong>on</strong>g> Held for the EOI <strong>on</strong> Empanelment <str<strong>on</strong>g>of</str<strong>on</strong>g> Architect Firms forpreparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> various draw<strong>in</strong>gs and designs <str<strong>on</strong>g>of</str<strong>on</strong>g> several civil c<strong>on</strong>structi<strong>on</strong> worksundertaken by SSD Department.Date: 28 th December 2012Time: 12:30 PM.Venue: C<strong>on</strong>ference Hall, SCSTRTI, Bhubaneswar.1. Participants List: From SSD DepartmentSr. No. Name <str<strong>on</strong>g>of</str<strong>on</strong>g> Participants Organizati<strong>on</strong> / Designati<strong>on</strong>1 Pr<str<strong>on</strong>g>of</str<strong>on</strong>g>. (Dr.) A.B Ota, IAS Director (ST) cum Additi<strong>on</strong>al Secretary, SSDDepartment.2 Shri. Ashok Pattnayak Technical Executive, PMU, ST&SC DevelopmentDepartment, Odisha.3 Shri. Gajanan Rauta Project Coord<strong>in</strong>ator, PMU, ST&SC DevelopmentDepartment.2. Participants List: From Prospective Agencies. (Refer Attendance Sheet at Annexure-I)3. Dur<strong>in</strong>g the meet<strong>in</strong>g various queries were raised by the participat<strong>in</strong>g agencies, for which thequery and the respective compliance are menti<strong>on</strong>ed below.Sr. No Reference Clarificati<strong>on</strong> Sought Comments/ Clarificati<strong>on</strong>s1 Page-13 EMD <str<strong>on</strong>g>of</str<strong>on</strong>g> Rs. 10,000may be waved out asit c<strong>on</strong>tradictsArchitect Act 1972It is clarified that the EMD <str<strong>on</strong>g>of</str<strong>on</strong>g> Rs. 10,000/- is waivedand at this stage, the agencies need not submit theirEMD. However, the Document development fee <str<strong>on</strong>g>of</str<strong>on</strong>g>Rs. 1000/- need to be submitted al<strong>on</strong>g with the2 Types <str<strong>on</strong>g>of</str<strong>on</strong>g> Projects,their average values,aprox locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>projects may pleasebe menti<strong>on</strong>ed.technical bid document.It is clarified that the department undertakes varioustypes <str<strong>on</strong>g>of</str<strong>on</strong>g> civil c<strong>on</strong>structi<strong>on</strong> works viz.a) Residential/ N<strong>on</strong> residential Educati<strong>on</strong>al <strong>in</strong>frastructureb) Hostel build<strong>in</strong>g rang<strong>in</strong>g from 100 seated to 500 seated.c) Toilets at schools and hostelsd) Staff Quartere) Multi purpose hallf) D<strong>in</strong><strong>in</strong>g cum Kitchen build<strong>in</strong>gg) Boundary wallh) Gate complexi) Additi<strong>on</strong>al class roomsj) Up gradati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> build<strong>in</strong>g worksk) Agro and retail out letsl) Godowns and storage build<strong>in</strong>gsm) Cold storage unitsn) Roads, bridges and culverts etc.The above works are tentative and the departmentshall undertake new category <str<strong>on</strong>g>of</str<strong>on</strong>g> works as and whenrequired.Page 1 <str<strong>on</strong>g>of</str<strong>on</strong>g> 7<str<strong>on</strong>g>M<strong>in</strong>utes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>Pre</str<strong>on</strong>g>-<str<strong>on</strong>g>Bid</str<strong>on</strong>g> <str<strong>on</strong>g>Meet<strong>in</strong>g</str<strong>on</strong>g> Held for the EoI <strong>on</strong> Empanelment <str<strong>on</strong>g>of</str<strong>on</strong>g> Architect Firms for preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>draw<strong>in</strong>gs and designs <str<strong>on</strong>g>of</str<strong>on</strong>g> various civil c<strong>on</strong>structi<strong>on</strong> works undertaken by ST&SC DevelopmentDepartment.


3 Is there anyrequirement tosupervise the projectdur<strong>in</strong>g c<strong>on</strong>structi<strong>on</strong>?4 Is there any site visitrequired forpreparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>draw<strong>in</strong>gs/ designs/estimates.5 Will Departmentfurnish all<strong>in</strong>formati<strong>on</strong> requiredby c<strong>on</strong>sultant for theprupose <str<strong>on</strong>g>of</str<strong>on</strong>g> design.6 The EOI is silentabout EnergyC<strong>on</strong>servati<strong>on</strong> Act-2001. As per said act,a build<strong>in</strong>g hav<strong>in</strong>gcerta<strong>in</strong> criteria shouldbe designed as perOdisha EnergyC<strong>on</strong>servati<strong>on</strong> build<strong>in</strong>gcode. Would you liketo give exculsiveweight- age dur<strong>in</strong>gf<strong>in</strong>ancial evaluati<strong>on</strong>for previousexperience <str<strong>on</strong>g>of</str<strong>on</strong>g> mak<strong>in</strong>genergy efficientbuild<strong>in</strong>gs.7 What is the Locati<strong>on</strong> /Locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> theProject?8 What is theApproximate budget<str<strong>on</strong>g>of</str<strong>on</strong>g> the projects?No, The selected agency has to prepare the blue pr<strong>in</strong>t<str<strong>on</strong>g>of</str<strong>on</strong>g> the master draw<strong>in</strong>g, design, estimate <strong>on</strong>ly and thedepartment will prepare the detailed work<strong>in</strong>gdraw<strong>in</strong>gs/ designs/ estimates etc by its owneng<strong>in</strong>eer<strong>in</strong>g w<strong>in</strong>g. However, at the time <str<strong>on</strong>g>of</str<strong>on</strong>g>preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> detailed draw<strong>in</strong>gs/ designs/ estimatesetc, the department may seek clarificati<strong>on</strong> <strong>on</strong> the<strong>in</strong>itial master lay out plans and estimates submittedby the agency.The agencies may visit the site before preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>the plans and estimates, however, it is not mandatoryfor them. In case, a site specific design is required,the deptt. will arrange for the site visit <str<strong>on</strong>g>of</str<strong>on</strong>g> theeng<strong>in</strong>eer/ Architect/ representative <str<strong>on</strong>g>of</str<strong>on</strong>g> the agency tovisit the site and prepare the design.The department will <strong>in</strong>form the agency about itsrequirements <strong>on</strong> <strong>in</strong>dividual works viz. the type <str<strong>on</strong>g>of</str<strong>on</strong>g>work, the specificati<strong>on</strong>s/ dimensi<strong>on</strong>s to be complied,the locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the project, the land availability etc.On the basis <str<strong>on</strong>g>of</str<strong>on</strong>g> the requirement <str<strong>on</strong>g>of</str<strong>on</strong>g> the department,the agency has to prepare the lay out plans andestimates.As the department is keen to c<strong>on</strong>struct quality<strong>in</strong>frastructure at the same time follows the norms <str<strong>on</strong>g>of</str<strong>on</strong>g>build<strong>in</strong>g codes, the <strong>in</strong>frastructure so created shall be<strong>in</strong> coherence with the energy efficient <strong>in</strong>frastructure.The technical evaluati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the bidders shall becarried out as per the parameters def<strong>in</strong>ed <strong>in</strong> clauseH.1 <str<strong>on</strong>g>of</str<strong>on</strong>g> the EoI document. However, the departmentshall give due weightage to bidders hav<strong>in</strong>g pastexperience <str<strong>on</strong>g>of</str<strong>on</strong>g> design<strong>in</strong>g Energy efficient build<strong>in</strong>gs.The locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the projects will be across the state <str<strong>on</strong>g>of</str<strong>on</strong>g>Odisha. However, major works are c<strong>on</strong>centrated <strong>in</strong>the TSP areas <str<strong>on</strong>g>of</str<strong>on</strong>g> the state.It is clarified that the cost <str<strong>on</strong>g>of</str<strong>on</strong>g> the project will varyfrom project to project. It will be difficult to ascerta<strong>in</strong>the value <str<strong>on</strong>g>of</str<strong>on</strong>g> the project at this po<strong>in</strong>t <str<strong>on</strong>g>of</str<strong>on</strong>g> time.However, the build<strong>in</strong>g norms <str<strong>on</strong>g>of</str<strong>on</strong>g> the PWD departmentand the space norms <str<strong>on</strong>g>of</str<strong>on</strong>g> the exist<strong>in</strong>g schemes shall befollowed at the time <str<strong>on</strong>g>of</str<strong>on</strong>g> preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> designs andestimates.Page 2 <str<strong>on</strong>g>of</str<strong>on</strong>g> 7<str<strong>on</strong>g>M<strong>in</strong>utes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>Pre</str<strong>on</strong>g>-<str<strong>on</strong>g>Bid</str<strong>on</strong>g> <str<strong>on</strong>g>Meet<strong>in</strong>g</str<strong>on</strong>g> Held for the EoI <strong>on</strong> Empanelment <str<strong>on</strong>g>of</str<strong>on</strong>g> Architect Firms for preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>draw<strong>in</strong>gs and designs <str<strong>on</strong>g>of</str<strong>on</strong>g> various civil c<strong>on</strong>structi<strong>on</strong> works undertaken by ST&SC DevelopmentDepartment.


9 Approximate area tobe developed10 Is the authorityapprovals are<strong>in</strong>volved or not?11 Are you plann<strong>in</strong>g forlow cost hous<strong>in</strong>g?12 Are you plann<strong>in</strong>g forgreen build<strong>in</strong>g?13 Soil survey ortopographical will be<strong>in</strong> whose scope?14 In the f<strong>in</strong>ancial bidformat, the quotes areasked <strong>in</strong> % value <str<strong>on</strong>g>of</str<strong>on</strong>g>the project cost.However, thecomp<strong>on</strong>ents likeapplicable taxes,grand total <strong>in</strong> (INR)and Grand total <strong>in</strong>(Fig) are menti<strong>on</strong>ed.K<strong>in</strong>dly clarify?15 Request for extensi<strong>on</strong><str<strong>on</strong>g>of</str<strong>on</strong>g> Date <str<strong>on</strong>g>of</str<strong>on</strong>g> submissi<strong>on</strong><str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>Bid</str<strong>on</strong>g>.Each <str<strong>on</strong>g>of</str<strong>on</strong>g> the project is <str<strong>on</strong>g>of</str<strong>on</strong>g> different nature and thedimensi<strong>on</strong>s/ space norms vary from project toproject. At the time <str<strong>on</strong>g>of</str<strong>on</strong>g> preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> plans andestimates, the department shall <strong>in</strong>form about therequirements and <strong>on</strong> the basis <str<strong>on</strong>g>of</str<strong>on</strong>g> the requirements,the designs are to be prepared.It is clarified that the agency has to <strong>on</strong>ly submit thelay out plans and prelim<strong>in</strong>ary cost estimatesdeveloped <strong>on</strong> the basis <str<strong>on</strong>g>of</str<strong>on</strong>g> the requirement <str<strong>on</strong>g>of</str<strong>on</strong>g> thedepartment and build<strong>in</strong>g norms. The department shalltake necessary approval from authority/ies forc<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the proposed <strong>in</strong>frastructure.The department is look<strong>in</strong>g for quality <strong>in</strong>frastructureand the works should be technically pro<str<strong>on</strong>g>of</str<strong>on</strong>g>ed.However, the department will encourage to br<strong>in</strong>g<strong>in</strong>novative soluti<strong>on</strong>s to the <strong>in</strong>frastructure work without compromis<strong>in</strong>g to the technical soundness andquality <str<strong>on</strong>g>of</str<strong>on</strong>g> the <strong>in</strong>frastructure works.The department shall look for energy savy<strong>in</strong>frastructure.It is clarified that the department through its owneng<strong>in</strong>eer<strong>in</strong>g w<strong>in</strong>g shall prepare the detailed costestimate, where <strong>in</strong> the soil survey, topographicalsurvey shall be carried out. However, <strong>in</strong> case it isrequired, the agencies shall be requested to carry outthe same and the cost to wards the survey work shallbe borne by the department.It is clarified that the f<strong>in</strong>ancial bid (Part-A) shall bequoted <strong>in</strong> terms <str<strong>on</strong>g>of</str<strong>on</strong>g> % value <str<strong>on</strong>g>of</str<strong>on</strong>g> the total project costand not <strong>in</strong> form <str<strong>on</strong>g>of</str<strong>on</strong>g> INR. However, <strong>in</strong> Part-B <str<strong>on</strong>g>of</str<strong>on</strong>g> thef<strong>in</strong>ancial bid, the quote is to be <strong>in</strong> the form <str<strong>on</strong>g>of</str<strong>on</strong>g> INR.The revised f<strong>in</strong>ancial bid is placed at Annexure-II forreference.The department has c<strong>on</strong>sidered the request and thedate <str<strong>on</strong>g>of</str<strong>on</strong>g> submissi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the bid is extended up to 16 thJanuary 2013. The bids shall be received up to 15:00Hrs. The Technical bid shall be opened at 17:00 Hrs<strong>on</strong> the same day.Page 3 <str<strong>on</strong>g>of</str<strong>on</strong>g> 7<str<strong>on</strong>g>M<strong>in</strong>utes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>Pre</str<strong>on</strong>g>-<str<strong>on</strong>g>Bid</str<strong>on</strong>g> <str<strong>on</strong>g>Meet<strong>in</strong>g</str<strong>on</strong>g> Held for the EoI <strong>on</strong> Empanelment <str<strong>on</strong>g>of</str<strong>on</strong>g> Architect Firms for preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>draw<strong>in</strong>gs and designs <str<strong>on</strong>g>of</str<strong>on</strong>g> various civil c<strong>on</strong>structi<strong>on</strong> works undertaken by ST&SC DevelopmentDepartment.


Annexure-IPage 4 <str<strong>on</strong>g>of</str<strong>on</strong>g> 7<str<strong>on</strong>g>M<strong>in</strong>utes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>Pre</str<strong>on</strong>g>-<str<strong>on</strong>g>Bid</str<strong>on</strong>g> <str<strong>on</strong>g>Meet<strong>in</strong>g</str<strong>on</strong>g> Held for the EoI <strong>on</strong> Empanelment <str<strong>on</strong>g>of</str<strong>on</strong>g> Architect Firms for preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>draw<strong>in</strong>gs and designs <str<strong>on</strong>g>of</str<strong>on</strong>g> various civil c<strong>on</strong>structi<strong>on</strong> works undertaken by ST&SC DevelopmentDepartment.


Page 5 <str<strong>on</strong>g>of</str<strong>on</strong>g> 7<str<strong>on</strong>g>M<strong>in</strong>utes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>Pre</str<strong>on</strong>g>-<str<strong>on</strong>g>Bid</str<strong>on</strong>g> <str<strong>on</strong>g>Meet<strong>in</strong>g</str<strong>on</strong>g> Held for the EoI <strong>on</strong> Empanelment <str<strong>on</strong>g>of</str<strong>on</strong>g> Architect Firms for preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>draw<strong>in</strong>gs and designs <str<strong>on</strong>g>of</str<strong>on</strong>g> various civil c<strong>on</strong>structi<strong>on</strong> works undertaken by ST&SC DevelopmentDepartment.


Format-II (For works worth less than 20 lakh)FINANCIAL BID FORMATsAnnexure-IIEoI Notice No. :To:The Director (ST)ST&SC Development DepartmentOdisha SecretariatBhubaneswarSir:I/We hereby bid for provid<strong>in</strong>g the services for preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Plans, Estimates for various civilprojects to be under taken by the ST&SC Development Department, as PER THE TERMS OFREFERENCE GIVEN IN THIS TENDER Document with<strong>in</strong> the time specified and <strong>in</strong> accordancewith the specificati<strong>on</strong>s, design and <strong>in</strong>structi<strong>on</strong>s as per Special Terms and C<strong>on</strong>diti<strong>on</strong>s as well asGeneral Terms and C<strong>on</strong>diti<strong>on</strong>s. The rates are quoted <strong>in</strong> the prescribed format given below:Part-A: F<strong>in</strong>ancial <str<strong>on</strong>g>Bid</str<strong>on</strong>g> for the C<strong>on</strong>sultancy AssignmentSr. No Type <str<strong>on</strong>g>of</str<strong>on</strong>g> Work C<strong>on</strong>sultancy fee (In % value)<str<strong>on</strong>g>of</str<strong>on</strong>g> total value <str<strong>on</strong>g>of</str<strong>on</strong>g> the project1 <str<strong>on</strong>g>Pre</str<strong>on</strong>g>parati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Lay out plan2 <str<strong>on</strong>g>Pre</str<strong>on</strong>g>parati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Estimates3 <str<strong>on</strong>g>Pre</str<strong>on</strong>g>parati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Structural draw<strong>in</strong>gsTotalApplicable Taxesa) Service Taxb) Any other (Specify)Grand Total (Percentage)Part-B: F<strong>in</strong>ancial bid for Supply <str<strong>on</strong>g>of</str<strong>on</strong>g> Hard copy <str<strong>on</strong>g>of</str<strong>on</strong>g> the plans and estimatesSr. No Type <str<strong>on</strong>g>of</str<strong>on</strong>g> Work C<strong>on</strong>sultancy fee (In INR)1 Supply <str<strong>on</strong>g>of</str<strong>on</strong>g> 1 set <str<strong>on</strong>g>of</str<strong>on</strong>g> Hard copy <str<strong>on</strong>g>of</str<strong>on</strong>g> the Plans andestimates f<strong>in</strong>alized by the authority.2 Charge towards s<strong>in</strong>gle copies <str<strong>on</strong>g>of</str<strong>on</strong>g> blue pr<strong>in</strong>t.Amount (INR)Amount <strong>in</strong> (Figure)The rates <strong>in</strong>dicated are all-<strong>in</strong>clusive and are valid for the c<strong>on</strong>tract period.Figures for all the items menti<strong>on</strong>ed above will have to be filled by the bidder <strong>in</strong> percentage, fail<strong>in</strong>gwhich the <str<strong>on</strong>g>of</str<strong>on</strong>g>fer is liable to be c<strong>on</strong>sidered as n<strong>on</strong>-resp<strong>on</strong>siveIn the event <str<strong>on</strong>g>of</str<strong>on</strong>g> discrepancy <strong>in</strong> the f<strong>in</strong>ancial quote between the words and the figures the f<strong>in</strong>ancialquote <strong>in</strong>dicated <strong>in</strong> words will be c<strong>on</strong>sidered f<strong>in</strong>al.Signature <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>Bid</str<strong>on</strong>g>der with SealPage 6 <str<strong>on</strong>g>of</str<strong>on</strong>g> 7<str<strong>on</strong>g>M<strong>in</strong>utes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>Pre</str<strong>on</strong>g>-<str<strong>on</strong>g>Bid</str<strong>on</strong>g> <str<strong>on</strong>g>Meet<strong>in</strong>g</str<strong>on</strong>g> Held for the EoI <strong>on</strong> Empanelment <str<strong>on</strong>g>of</str<strong>on</strong>g> Architect Firms for preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>draw<strong>in</strong>gs and designs <str<strong>on</strong>g>of</str<strong>on</strong>g> various civil c<strong>on</strong>structi<strong>on</strong> works undertaken by ST&SC DevelopmentDepartment.


Format-II (For works worth more than 20 lakh)FINANCIAL BID FORMATsEoI Notice No. :To:The Director (ST)ST&SC Development DepartmentOdisha SecretariatBhubaneswarSir:I/We hereby bid for provid<strong>in</strong>g the services for preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Plans, Estimates for various civilprojects to be under taken by the ST&SC Development Department, as PER THE TERMS OFREFERENCE GIVEN IN THIS TENDER Document with<strong>in</strong> the time specified and <strong>in</strong> accordancewith the specificati<strong>on</strong>s, design and <strong>in</strong>structi<strong>on</strong>s as per Special Terms and C<strong>on</strong>diti<strong>on</strong>s as well asGeneral Terms and C<strong>on</strong>diti<strong>on</strong>s. The rates are quoted <strong>in</strong> the prescribed format given below:Part-A: F<strong>in</strong>ancial <str<strong>on</strong>g>Bid</str<strong>on</strong>g> for the C<strong>on</strong>sultancy AssignmentSr. No Type <str<strong>on</strong>g>of</str<strong>on</strong>g> Work C<strong>on</strong>sultancy fee (In % value)<str<strong>on</strong>g>of</str<strong>on</strong>g> total value <str<strong>on</strong>g>of</str<strong>on</strong>g> the project1 <str<strong>on</strong>g>Pre</str<strong>on</strong>g>parati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Lay out plan2 <str<strong>on</strong>g>Pre</str<strong>on</strong>g>parati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Estimates3 <str<strong>on</strong>g>Pre</str<strong>on</strong>g>parati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Structural draw<strong>in</strong>gsTotalApplicable Taxesa) Service Taxb) Any other (Specify)Grand Total (Percentage)Part-B: F<strong>in</strong>ancial bid for Supply <str<strong>on</strong>g>of</str<strong>on</strong>g> Hard copy <str<strong>on</strong>g>of</str<strong>on</strong>g> the plans and estimatesSr. No Type <str<strong>on</strong>g>of</str<strong>on</strong>g> Work C<strong>on</strong>sultancy fee (In INR)1 Supply <str<strong>on</strong>g>of</str<strong>on</strong>g> 1 set <str<strong>on</strong>g>of</str<strong>on</strong>g> Hard copy <str<strong>on</strong>g>of</str<strong>on</strong>g> the Plans andestimates f<strong>in</strong>alized by the authority.2 Charge towards s<strong>in</strong>gle copies <str<strong>on</strong>g>of</str<strong>on</strong>g> blue pr<strong>in</strong>t.Amount (INR)Amount <strong>in</strong> (Figure)The rates <strong>in</strong>dicated are all-<strong>in</strong>clusive and are valid for the c<strong>on</strong>tract period.Figures for all the items menti<strong>on</strong>ed above will have to be filled by the bidder <strong>in</strong> percentage, fail<strong>in</strong>gwhich the <str<strong>on</strong>g>of</str<strong>on</strong>g>fer is liable to be c<strong>on</strong>sidered as n<strong>on</strong>-resp<strong>on</strong>siveIn the event <str<strong>on</strong>g>of</str<strong>on</strong>g> discrepancy <strong>in</strong> the f<strong>in</strong>ancial quote between the words and the figures the f<strong>in</strong>ancialquote <strong>in</strong>dicated <strong>in</strong> words will be c<strong>on</strong>sidered f<strong>in</strong>al.Signature <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>Bid</str<strong>on</strong>g>der with SealPage 7 <str<strong>on</strong>g>of</str<strong>on</strong>g> 7<str<strong>on</strong>g>M<strong>in</strong>utes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the <str<strong>on</strong>g>Pre</str<strong>on</strong>g>-<str<strong>on</strong>g>Bid</str<strong>on</strong>g> <str<strong>on</strong>g>Meet<strong>in</strong>g</str<strong>on</strong>g> Held for the EoI <strong>on</strong> Empanelment <str<strong>on</strong>g>of</str<strong>on</strong>g> Architect Firms for preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>draw<strong>in</strong>gs and designs <str<strong>on</strong>g>of</str<strong>on</strong>g> various civil c<strong>on</strong>structi<strong>on</strong> works undertaken by ST&SC DevelopmentDepartment.