12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Contract Award (end January 2011) XSEASON 1 SEASON 2SEASON 32010 2011 2011 2012 2012 20137 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 72013SEASON 42014Mobilization/Site PreparationOffice/Personnel Mobilization 1 1 1 1 1 1 1 1 1 1Accomodation Construction 1 1 1 1 1 1 1 1 1 1 1 1Dredging and Reclamation of Work Areas * 2 2 2Preparation of Accommodation/Work Areas, incl.Jetties 1 1 1 1 1 1 1 1Material Supply InfastructureGeobags Filling and Stockpiling 1 1 1 1 1 1 1 1Rock Supply 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1CC Block Production 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1River Training Works ConstructionNB Revetment (Dredging + Placement) 2 2 2 2 2 2 1Dredge Ferry By‐pass Channel 2SB Main Revetment (Dredging + Placement) 2 2 2 2 2 2 2 1SB Secondary Revetment (Dredge + Placement) 2 2 2 2 2 2 2 1EQUIPMENT REQUIREMENTSShallow Reach ‐ Cuttersuctiondredger #1 MOB 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2Deep Reach ‐ Cuttersuctiondredger #2 MOB 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2Deep Reach ‐ Cuttersuctiondredger #3 MOB 2 2 2 2 2 2 2 2 2 2 2 2 2 2Reclamation equipment ** MOB 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2DEMOBDEMOBDEMOBDEMOBGeobags transport equipment 1 1 1 1 1 1Geobags dumping pontoon #1 1 1 1 1 1 1Geobags dumping pontoon #2 1 1 1 1 1 1Rock handling equipment *** 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Side Stone Dumping Vessel (SSDV) #1 MOB 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DEMOBSide Stone Dumping Vessel #2 MOB 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DEMOBSide Stone Dumping Vessel #3 MOB 1 1 1 1 1 1 1 1 1 1 1 1 DEMOBCC Block casting yard, on NB first, on SB later 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1CC Block Transportation Equipment 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1CC Block Placement Equipment 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Equipment workshop facilities **** 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Abbreviations: NOTES:SB ‐ South Bank *) Work areas incl. or excl. a work harborNB ‐ North Bank **) Loaders, bulldozers, excavators, number varying with number of dredgers***) Dumptrucks, loaders and excavators for unloading rock from transport pontoons, stockpiling and reloading to SSDV's****) Facilities for company cars, for reclamation and rock handling equipment and for all floating equipmentFigure 2-14: Tentative Construction Schedule for the RTW2-24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!