Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SlNo.Contract Package2010 2011 2012 2013 201420151Construction Yards for Main<strong>Bridge</strong>- Preparatory Works2Main <strong>Bridge</strong> and ApproachViaductsNominal 42 months3 River Training Works (RTW)Nominal 50 months45Janjira Approach Road &Selected <strong>Bridge</strong> End FacilitiesMawa Approach Roads &Selected <strong>Bridge</strong> End FacilitiesNominal 24 monthsNominal 36 months6 Service Area-2Nominal 36 monthsNotes : 1. Defects Liability Periods (nominal 12 months) not indicated for each contract.2. Formal procurement process has only commenced to date, for Sl. No.2 (Main <strong>Bridge</strong> and Approach Viaducts).Prequalification advertised on 11 April 2010.3. RTW Contract duration is extremely dependent on contract award date relative to Dry Seasons.Figure 2-13: Implementation Schedule of the <strong>Project</strong>2-23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!