12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annex 10-2EMMP (ECP)ECP 9: Borrow o AreasECP 15: Road TransportDevelopment & Operationand Road TrafficECP 10: Air QualityManagementManagementECP 16: River TransportECP 11: Noise andmanagementVibration ManagementECP 17: Construction ti CampECP 12: Protection ti of FloraManagementECP 13: Protection ofECP 18: Cultural andFaunaReligious iIssuesECP 14: Protection ti ofECP 19: Workers HealthFisheriesand SafetyEnvironmental lE Enhancement Plans• Community environmental management plan(CEMP) for design and development ofResettlement Sites (RS)• Tree compensation and greenbelt developmentplan (100 ha land, 405,461 461 trees)• Public Health Action Plan• Conservation plans for development of birdsanctuary and wildlife museum• Agriculture development plan• Income and livelihood lih restoration ti plan (ILRP)EMMP (Dredged d Material Disposal)Environmental lE Enhancement Fund• Implementation of EMMP• Environmental• O/M CEMPEnhancement• O/M of Wildlife MuseumCommittee• O/M Bird Sanctuary • EEF (1% of toll)• Environmental Health RevenuefromTollEEFTrafficEducation CampaignYear(million(million(million(AADT)tk)USD)USD)• Environmental 2014 12,056 3,229 46.13 046 0.46enhancement e projects pojecs2015 13,686 3,667 52.39 052 0.52EEF2016 15,587587 4,180 59.71 0600.602017 17,808 4,782 68.31 068 0.682018 20,411 5,492 78.46 078 0.782019 23,469 6,329 90.41 0900.902020 27,068 7,319 104.56 105 1.052024 35,871 9,278 132.54 133 1.332034 69,565 16,149149 230.70 2312.31Emergency Response PlanERT Management CommitteeChair-Executive Director BBADeputy Director Member Secretary -Emergency Management CoordinatorSafeguardUnit-Environment Representatives of:-Bangladesh Army-Police Departmentt-Fire Departmentt-Disaster Management BureauEmergency Response Operational CommandERC Operational Network O/M Contractor PoliceResponse team Traffic ManagementBangladesh ArmyControllers - DistrictAsset Management Fire DepartmenttCommissioners iToll CollectionDisasterContractorManagement BureauOperational ResourceMuseum OperatorManagement TeamMedical CliniciDC, MadaripurDC, ShariatpurDC, MunshiganjMediaCommunicationsMangerOther StudiesClimate Change• Sea level rise at bridgesite is 0.47m. Sea levellrise and increase basinrainfall, 0.63m rise inwater level• The predicted peakdischarge of 151,100100cumec and lowest flow as7,345 cumec• Maximum wind speed ispredicted as 126 km/hEcologyogy12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!