12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annex 10-2Construction Yard-2Environmental Impacts: BEFPre-constructiontiOperation Land Acquisition iti (136 ha) Water supply and sanitation Vegetation ti Clearance (35,690) Power supplyConstruction Air and Noise Pollution Noise and Vibration Solid waste management Fisheries i (1.62 tons) Increased economic Crop loss (3,647 tons)activitiesiti Change in landuseConstruction ti YardConstructionti Access road Quarry and Borrow Materials Transporting materials Air and Water Pollution Noise and Vibration Solid waste management Storage of petrochemicalproducts Disposal of wastePre-construction Tree cutting and poaching Land Acquisition (157 ha) Social instability Vegetation ti Clearance Health, Safety, and Hygiene(4,762 trees)Environmental Management PlanConstruction Yard-1EMMP MatrixECPs• ActivityECP 1: Waste Management• ImpactECP 2: Fuels and Hazardous• Mitigation measures Goods Management• Monitoring i means ECP 3: Water Resources• Frequency of Monitoring iManagement• BudgetECP 4: Drainage Management• Implementation agencyECP 5: Soil Quality Managementage e • Supervision i AgencyECP 6: Erosion and SedimentControlECP 7: Top Soil ManagementECP 8: Topography andLandscaping11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!