12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Annex 10-2Approach Road: Current ScenarioEnvironmental lI Impacts: RailwayPre-constructionti Operation Land Acquisition iti (53.67 ha) Fuel efficiency i and anti- Vegetation ti Clearance (72,800)idlingConstruction Air and Water Pollution Agriculture production loss Noise and Vibration(807 tons) Railway safety Loss of topsoil (80,505m 3 ) Use of biodegradable Drainage (5 rivers and 14grease for track maint.streams) Air Pollution (1,432 tons dust) Water supply and sanitationti Increased economic ocactivities Emergency Response Plan HIV/AIDS and STDEnvironmental lI Impacts: RoadsPre-constructiontiOperation Land Acquisition iti (118 ha) and Air and Water PollutionResettlementt Noise and VibrationConstructionti Traffic safety Vegetation ti clearance (155,226 Increased economictrees)activitiesiti Loss of agriculture production Accidental spills of(3,126 tons) petroleum products Fisheries i loss (8.24 tons) HIV/AIDS and STD Loss of topsoil (97,836 m 3 ) Drainage (5 rivers and 14streams) Air Pollution (1,740 tons dust) Reuse of topsoil, employmentgeneration, and landuse change10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!