12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annex 10-1List of Stakeholders Invited for Public Consultation MeetingsRepresentative of government agencies in Munshiganj, Shariatpur and MadaripurDistricts:District Commissioners (DC)UNOs (Upazila Nirbahi Officer) of Lauhajong, Janjira and Shibchar UpazilaAssistant Commissioner of LandRoads & Highways Department (RHD)Local Government Engineering Department (LGED)Bangladesh Water Development Board (BWDB)Directorate of Agriculture Extension (DAE)Forest Department (FD)Directorate of Fisheries (DOF)Bangladesh Inland Water Transport Corporation (BIWTC)Bangladesh Inland Water Transport Authority (BIWTA)Bangladesh Agricultural Development Corporation (BADC)Department of Public Health Engineering (DPHE)River Research Institute (RRI), FaridpurPublic Representatives: Hon. Sagupta Yashmin Emeli, M.P., Munshiganj Hon. B.M. Mozzamel Hoq, M.P., Shariatpur; Hon. Liton (proper name), M.P., Madaripur M.H. Akand. Upazila Chairman, Janjira, Shariatpur; Rehana Parveen, Upazila Vice Chair, Janjira, Shariatpur; Rezaul Talukder, Upazila Chairman, Shibchar, Madaripur; Fatima Akhter, Upazila Vice Chair, Shibchar, Madaripur ; Osman Gani Talukder, UpazilaChairman, Lauhajong, Munshiganj; Ranu Akhter, Upazila Vice Chair Lauhajong, Munshiganj; Community leaders of the project area affected by the proposed projectRepresentatives of NGOs (such as BRAC, ASHA, Grameen Motsha Foundation, etc.)<strong>Padma</strong> <strong>Multipurpose</strong> <strong>Bridge</strong> Design <strong>Project</strong>Final Report (Environmental Action Plan)Environmental Impact Assessment ReportJune 7, 2010A10-1-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!