are being studied by RTW team. Figure 2-5 shows the updated extent of the north and south bankprotection works.Figure 2-5: River training works layout2.3.2.1 North Bank - Main <strong>Bridge</strong> Viaduct and End Facilities13. The morphology and soils investigations indicate that there has been slow but progressiveerosion along the north bank (Mawa side) over the last several decades. Based on the historic rates of2-9