12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

indirectly influenced by the project. This section proposes a policy statement and guiding principles forimplementing the policy as part of the normal conduct of the business.1. Suggested Policy Statement3. The BBA environmental policy should:(i)(ii)(iii)(iv)(v)(vi)(vii)be relevant to activitiescomply with national environmental legislation and standardscommit to the prevention of pollutioncommit to continual improvementcommit to setting environmental objectives and targetsbe known to employees and public, andadopt, wherever and whenever possible, clean technologies in design, construction, andoperation of project facilities4. Based on these principles, the following policy statement for BBA is suggested. The BBA willrevise the statement as appropriate based on the above principles.Our core business is to establish large bridges, toll roads and elevated expressways inBangladesh. We give utmost importance to environmental aspects in planning, designing,construction and operation of our businesses in internationally accepted standards in fullcompliance with all relevant national laws, regulations, and standards. We will strive to excel inthis endeavour with full involvement of our staff and the public.2. Guiding Principles for Policy Implementation5. The following guiding principles are suggested for implementation of BBA’s environmental policy:(i)(ii)(iii)(iv)(v)(vi)(vii)(viii)(ix)(x)BBA will review the project environmental impact assessment and the EMMP to identifygaps or inadequacies that could undermine environmental integrity of the project. If suchinadequacies are found, BBA will initiate dialogue with relevant agencies on measures toimprove the environmental impact assessment and EMMP.BBA will review the detailed designs and specifications prepared by the engaged designconsultants to ensure that they are environmentally sound and fully comply with the EMS.BBA will include EMMP in the construction contracts along with appropriateenvironmental management clauses, and ensure that the contractors fully comply with theEMMP and applicable national rules and regulations.BBA will hire contractors who are compliant of ISO 14001 EMS certification, OHSAH18000 (2007) related Occupational Health and Safety (OHS) and SA 8000 (SocialAccountability) for all major worksBBA will fully comply with the environmental monitoring and reporting requirementsduring construction as prescribed in the EMMP and in compliance with applicable nationallaws and regulations.BBA will fully comply with environmental monitoring and reporting requirements duringthe operation of project facilities as prescribed in the EMMP in compliance with applicablenational laws and regulations.BBA will create a structure to monitor the environmental performance of each project sitein such areas as noise, air pollution, water use, waste management, energy use andgreenery.BBA will ensure that all PAPs have no pending issues related to compensation andresettlement assistance.BBA will implement an appropriate public information program related to its environmentaland social management activities.BBA will continue to be an active partner of the communities in which it operates.<strong>Padma</strong> <strong>Multipurpose</strong> <strong>Bridge</strong> Design <strong>Project</strong>Final Report (Environmental Action Plan)Enviromental Assessment ReportJune 7, 2010A9-5-20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!