12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

He/She will have a wide range of knowledge on procedures and processes involved indeveloping environmental management system, and design training modules and materials.He/She will be a qualified professional of any discipline with 3 years experience inCurriculum/Material Development. He/She will also have a knowledge and experience in theassessment methods use to evaluate the effectiveness of the proposed training. TheSpecialist will be fully familiar with the delivery methods to be employed to conduct variouskinds of training courses.E. Supervision11. The team will work in association with the PIU, reporting to the project director of the PIU on aday-to-day basis. Overall supervision will be done by the EU.F. Outputs12. The team’s outputs will include: (i) an inception report at the end of the first month, (iii) a draft finalreport at the end of 11 th month, containing a description of achievements, details of the trainingservices provided, including all materials, an assessment of their effectiveness in meeting objectives,and recommendations for further training assistance, (iii) and a final report at the end of assignment.Further, a bimonthly report will be submitted by the consultant at the end of each second month untiltenth month. All reports will be submitted both in English13. In addition, the team will prepare training materials for both training programs. Each trainingprogram will consist of about 10 modules including some case studies and worked out examples. Thedraft training modules should be submitted to the SDEA before conducting training programs forevaluation and final training modules will be presented at the end of assignment.G. BudgetItemUnitUnitCost,US$QuantityTotalCost, US$A. Remuneration and Per Diemsi Key Professional StaffTeam Leader and Environmental Specialist MM 25,000 6 150,000Training Delivery Specialist MM 4,000 12 48,000Curriculum/Material Development Specialist MM 5,000 12 60,000ii Support StaffComputer Operator MM 2,000 12 24,000Sub Total A 270,000B. Airfare and Transporti. Airfare RT 5,000 3 15,000ii. Local Transport Day 100 10 1,000Sub Total B 16,000C. Training Module Preparation andProduction No 4 2500 10,000D. Training Allowance days 64 50 3,200F. Contingency (10% of subtotal, A+B+C+D) LS 1 4,520Grand Total (A+B+C+D) 328,800<strong>Padma</strong> <strong>Multipurpose</strong> <strong>Bridge</strong> Design <strong>Project</strong>Final Report (Environmental Action Plan)Enviromental Assessment ReportJune 7, 2010A9-5-17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!