Figure 2-4: Cross-section of the main bridge2.3.2 River Training Works12. The purpose of River Training Works (RTW) on both sides of the River at bridge location is toprotect the River bank from erosion so that the bridge, approach roads, BEF and railways can remainintegrated and functional during the operation and maintenance phase of the <strong>Project</strong>. Various options2-8