12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

C. International Consultants1. Unit Leader/Environmental Specialist 1 and Environmental Specialist 2ResponsibilitiesThe duties of the Consultant shall include, but not limited to: update the EMMP and CEMP prepared by design consultant; ensure that the construction methods as proposed by the contractor forcarrying out the works are satisfactory, with particular references to thetechnical requirements of sound environmental standards on the basis of theEIA; carry out environmental management seminars for contractors and BBA staff; prepare quarterly environmental monitoring and annual reports of implementingthe EMMP and CEMP as part of project implementation report; monitor the implementation of the health and safety program at work sitesincluding the information and education campaign on sexually-transmitteddiseases and HIV/AIDS (human immunodeficiency virus/acquiredimmunodeficiency syndrome) as required by the civil works contracts.2. Environmental Specialist (Dredging and RTW) 3ResponsibilitiesThe duties of the Consultant shall include, but not limited to: ensure that the construction methods as proposed by the contractor (especiallydredging contractor) for carrying out the works are satisfactory, with particularreferences to the technical requirements of the ECP, EMMP and EIA reports; carry out environmental management seminars for contractors and BBA staff; prepare quarterly environmental monitoring and annual reports ofimplementing the EMMP as part of project implementation report; monitor the implementation of the health and safety program at work sites.D. National Consultants1. National Environmental Specialists/EngineersResponsibilitiesThe duties of the Consultant shall include, but not limited to: Assist international environmental specialists in ensuring that that theconstruction methods as proposed by the contractor for carrying out the worksare satisfactory, with particular references to the technical requirements ofsound environmental standards on the basis of EMMP; Assist international environmental specialists in preparing quarterlyenvironmental monitoring and annual report of implementing this plan as part ofproject implementation report, and carry out environmental managementseminars for contractors and BBA staff; Assist in plantation and greenbelt development work along the road and otherproject site as proposed in the EMMP; Ensure that the contractors do not damage the existing plantations.<strong>Padma</strong> <strong>Multipurpose</strong> <strong>Bridge</strong> Design <strong>Project</strong>Final Report (Environmental Action Plan)Enviromental Assessment ReportJune 7, 2010A9-3-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!