12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annex 8-3Position Rank No. Of PersonalMajor Unit Major 1Captain Unit Commander 1Lieutenant. Officer Level Entry Post 1GCO Non Commission Officer 1Subedor DO 174Table A8.2- 2: Police ForcePosition Ranks No. Of PersonalInspector OC 1Sub Inspector Daroga 1Assistant Sub Inspector Investigator 1Police Force DO 23Table A8.2- 3: Fire DepartmentPositionNo. Of PersonalStation Officer 1Sub Officer 1Leader 1Fire Truck Driver 5Fireman 12Table A8.2- 4: Medical FacilitiesPositionNo. of PersonalDoctor 1Paramedic 2Nurse 4Administration Staff 2Ambulance Driver 5b. EquipmentThe annual budget for the day to day operations of the ERC and other activities such as equipmentmaintenance will be established by the ERT. The total equipment cost for the ERC will beapproximately US$1,228,455. The type of equipment and cost breakdown is given in Table A8.2-5.Table A8.2-5: Emergency Response Equipment and CostEquipment Quantity Unit Cost (US$) Cost (US$)) AgencyPolice Vehicles 2 15,000 30,000 PoliceRoad Patrolling Vehicles 2 10,000 20,000 PoliceFire Truck 2 125,000 250,000 Fire DepartmentAmbulance 2 15,000 30,000 O/M ContractorTowing trucks 2 30,000 60,000 PoliceRailway Crane 1 500,000 500,000 BangladeshRailwayHeavy crane 2 100,000 200,000 PoliceHazmat suits 4 2,000 8,000 Fire DepartmentLife Jackets 50 40 2,000 Fire DepartmentFloating Boat 2 2,500 5,000 Fire DepartmentSound signalling Device 15 100 1,500 Police<strong>Padma</strong> <strong>Multipurpose</strong> <strong>Bridge</strong> Design <strong>Project</strong>Final Report (Environmental Action Plan)Environmental Impact Assessment Report A8-38June 7, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!