Annex 8-2Implementation Issues:1. Joint Verification (DC and BBA) and/or Census will identify (records floor areas and category) structure fortitled owners.2. PVAC will recommend replacement value (RV) of structure considering the cost of materials, labor inputsand land development cost at current market rates. Ministry of Communications will approve the RV ofstructures recommended by PVAC.3. Compensation must be paid before EP dismantles and removes the structures as per civil worksrequirement.4. The date of service of notice u/s 3 will be the cut-off date for titled owners and BIDS Census will berecognized as the cut-off date for structures not recognized by DC. In case of major differences identifiedbetween databases, BBA will verify the data through the Inventory Verification Committee (IVC).Loss Item 5: LOSS OF COMMERCIAL/INDUSTRIAL/CPR STRUCTURES WITH TITLE TO LANDUnit of Entitlement Entitlements Application Guidelines AdditionalServicesLegal owners as identifiedby DC in the process of CCLpayment.Assistance inrelocation andreconstruction.1. RV of commercial,industrial, CPR structure.2. Transfer Grant @ Tk. 10(ten) per sft of affectedstructure.3. Reconstruction Grant @Tk. 15 (fifteen) per sft ofaffected structure.4. Owner will be allowed totake all salvageablematerials back free of cost.<strong>Padma</strong> <strong>Multipurpose</strong> <strong>Bridge</strong> Design <strong>Project</strong>Final Report (Environmental Action Plan)Environmental Impact Assessment Report A8-29June 7, 20101. Applicable to allstructures located onROW at cut-off dates.2. PVAC will recommendthe RV of structures.3. IVC will verify and recordstructures eligible for RVand other assistance.4. DC will pay CCL forstructure and if CCL isless than RV, BBA willpay the difference withassistance from INGO.5. BBA will provide otherresettlement benefitswith assistance fromINGO.Implementation Issues:1. Joint Verification identifies (records floor areas and category) structure for titled owners and Censusidentifies structure for non-titled owners.2. Replacement value (RV) of structure will be determined and approved in the process as stated in LOSSITEM 4.3. Compensation must be paid before EP dismantles and removes the structures as per civil worksrequirement.4. The cut-off dates for titled owners and socially recognized owners as stated in LOSS ITEM 4.Loss Item 6: LOSS OF RESIDENTIAL AND OTHER PHYSICAL STRUCTURES (WITHOUT TITLE TOLAND)Unit of entitlement Entitlements Application Guidelines Additional1. Legal ownersidentified by DC inthe process ofCCL payment.2. Sociallyrecognized ownersof structures builton the ROW asidentified byCensus andverified by IVC.1. RV of structure.2. Transfer Grant @ Tk. 7(seven) per sft of affectedstructure.3. Reconstruction Grant @Tk.10 (ten) per sft of affectedstructure.4. Special Assistance of a onetimepayment of Tk. 5,000/-(five thousand) for eachfemale-headed, disabledheaded,elderly-headed and1. Applicable to all structureslocated on ROW at cut-offdates.2. PVAC will recommend theRV of structures.3. IVC will verify and recordstructures eligible for RV/other assistance and thelandlessness of residencelosing households forallocation of RS plot.4. DC will pay CCL forServicesPlot in theresettlement sitewill be providedfor residentialand commercialstructure losers,and assistancein relocation.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!