12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annex 8-1<strong>Project</strong> Activity/Impact SourceEnvironmental Impactsquality,.Mitigation Measures/ Management Guidelinesperson to relocate the animalVegetationclearanceConstructioncampsImpact on migratory birds, itshabitat and its active nestsClearance of vegetation mayimpact shelter, feeding and/orbreeding and/or physicaldestruction and severing ofhabitat areasThe Contractor shall Not be permitted to destruct active nests or eggs of migratory birds Minimize the tree removal during the bird breeding season. If works must be continuedduring the bird breeding season, a nest survey will be conducted by a qualified biologistprior to commence of works to identify and located active nests Minimize the release of oil, oil wastes or any other substances harmful to migratory birdsto any waters or any areas frequented by migratory birds.The Contractor shall Restrict the tree removal to the minimum required. Relocate hollows, where appropriate Fell the hollow bearing trees in a manner which reduces the potential for fauna mortality.Felled trees will be inspected after felling for fauna and if identified and readily accessiblewill be removed and relocated or rendered assistance if injured. After felling, hollowbearing trees will remain unmoved overnight to allow animals to move of their own volition.Illegal poaching Provide adequate knowledge to the workers regarding protection of flora and fauna, andrelevant government regulations and punishments for illegal poaching.ECP 14: Protection of Fisheries<strong>Project</strong> Activity/Impact SourceConstructionactivities in RiverEnvironmental ImpactsThe main potential impacts tofisheries are hydrocarbon spillsand leaks from riverine transportand disposal of wastes into theriverMitigation Measures/ Management GuidelinesThe Contractor shall Ensure the riverine transports, vessels and ships are well maintained and do not have oilleakage to contaminate river water. Contain oil immediately on river in case of accidental spillage from vessels and ships andin this regard, make an emergency oil spill containment plan to be supported with enoughequipments, materials and human resources Do not dump wastes, be it hazardous or non-hazardous into the nearby water bodies or inthe river<strong>Padma</strong> <strong>Multipurpose</strong> <strong>Bridge</strong> Design <strong>Project</strong>Final Report (Environmental Action Plan)Environmental Impact Assessment Report A8-16June 7, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!