12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Annex 8-1<strong>Project</strong> Activity/Impact SourceEnvironmental ImpactsDepletion and pollution ofgroundwater resourcesMitigation Measures/ Management Guidelinesproperly decommissionedInstall monitoring wells both upstream and downstream areas near construction yards andconstruction camps to regularly monitor the water quality and water levels.Protect groundwater supplies of adjacent lands<strong>Padma</strong> <strong>Multipurpose</strong> <strong>Bridge</strong> Design <strong>Project</strong>Final Report (Environmental Action Plan)Environmental Impact Assessment Report A8-6June 7, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!