12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Annex 8-1<strong>Project</strong> Activity/Impact SourceEnvironmental ImpactsMitigation Measures/ Management GuidelinesReturn the gas cylinders to the supplier. However, if they are not empty prior to theirreturn, they must be labeled with the name of the material they contained orcontain, information on the supplier, cylinder serial number, pressure, their last hydrostatictest date, and any additional identification marking that may be considered necessary.ECP 3:<strong>Project</strong> Activity/Impact SourceHazardous Materialand WasteDischarge fromconstruction sitesWater Resources ManagementEnvironmental ImpactsWater pollution from the storage,handling and disposal ofhazardous materials and generalconstruction waste, andaccidental spillageDuring construction both surfaceand groundwater quality may bedeteriorated due to constructionactivities in the river, seweragesfrom construction sites and workcamps. The construction workswill modify groundcover andtopography changing the surfacewater drainage patterns of thearea including infiltration andstorage of storm water. Thesechanges in hydrological regimelead to increased rate of runoff,increase in sediment andcontaminant loading, increasedflooding,groundwatercontamination, and effect habitatof fish and other aquatic biology.Mitigation Measures/ Management GuidelinesThe Contractor shall Follow the management guidelines proposed in ECPs 1 and 2. Minimize the generation of sediment, oil and grease, excess nutrients, organic matter,litter, debris and any form of waste (particularly petroleum and chemical wastes). Thesesubstances must not enter waterways, storm water systems or underground water tablesThe Contractor shall Install temporary drainage works (channels and bunds) in areas required for sediment anderosion control and around storage areas for construction materials Install temporary sediment basins, where appropriate, to capture sediment-laden run-offfrom site Divert runoff from undisturbed areas around the construction site Stockpile materials away from drainage lines Prevent all solid and liquid wastes entering waterways by collecting solid waste, oils,chemicals, bitumen spray waste and wastewaters from brick, concrete and asphalt cuttingwhere possible and transport to a approved waste disposal site or recycling depot Wash out ready-mix concrete agitators and concrete handling equipment at washingfacilities off site or into approved bunded areas on site. Ensure that tires of constructionvehicles are cleaned in the washing bay (constructed at the entrance of the constructionsite) to remove the mud from the wheels. This should be done in every exit of eachconstruction vehicle to ensure the local roads are kept clean.<strong>Padma</strong> <strong>Multipurpose</strong> <strong>Bridge</strong> Design <strong>Project</strong>Final Report (Environmental Action Plan)Environmental Impact Assessment Report A8-4June 7, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!