12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annex 8-1ECP 1: Waste Management<strong>Project</strong> Activity/Impact SourceGeneral WasteEnvironmental ImpactsSoil and water pollution from theimproper management of wastesand excess materials from theconstruction sites.Hazardous Waste Health hazards andenvironmental impacts due toimproper waste managementpracticesMitigation Measures/ Management GuidelinesThe Contractor shall Develop waste management plan for various specific waste streams (e.g., reusable waste,flammable waste, construction debris, food waste etc.) prior to commencing ofconstruction and submit to BBA for approval. Organize disposal of all wastes generated during construction in an environmentallyacceptable manner. This will include consideration of the nature and location of disposalsite, so as to cause less environmental impact. Minimize the production of waste materials by 3R (Reduce, Recycle and Reuse) approach. Segregate and reuse or recycle all the wastes, wherever practical. Prohibit burning of solid waste Collect and transport non-hazardous wastes to all the approved disposal sites. Vehiclestransporting solid waste shall be covered with tarps or nets to prevent spilling waste alongthe route Train and instruct all personnel in waste management practices and procedures as acomponent of the environmental induction process. Provide refuse containers at each worksite. Request suppliers to minimize packaging where practicable. Place a high emphasis on good housekeeping practices. Maintain all construction sites in a cleaner, tidy and safe condition and provide andmaintain appropriate facilities as temporary storage of all wastes before transportation andfinal disposal.The Contractor shall Collect chemical wastes in 200 liter drums (or similar sealed container), appropriatelylabeled for safe transport to an approved chemical waste depot. Store, transport and handle all chemicals avoiding potential environmental pollution. Store all hazardous wastes appropriately in bunded areas away from water courses. Make available Material Safety Data Sheets (MSDS) for hazardous materials on-siteduring construction. Collect hydrocarbon wastes, including lube oils, for safe transport off-site for reuse,<strong>Padma</strong> <strong>Multipurpose</strong> <strong>Bridge</strong> Design <strong>Project</strong>Final Report (Environmental Action Plan)Environmental Impact Assessment Report A8-2June 7, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!